SDA Repairs PHB's Retaining Wall on Jl. Pemuda
access_time February 13 2020 04:36 PM remove_red_eye 1240
Reported by Nurito | Translated by Maria Inggita
Reported by Nurito | Translated by Maria Inggita
East Jakarta Water Resources (SDA) Sub-department personnel repair channel's retaining wall on Jalan Pemuda, Jati Urban Village, Pulogadung. It was collapsed due to high rainfall intensity and water level since last week.
We deploy 20 personnel as well as heavy equipment to accelerate our work
East Jakarta SDA Sub-department Head, Santo conveyed, his side started to repair it since Monday (2/10). At first, his personnel cleaned up debris of collapsed retaining wall and installed piles of dolken woods.
"We deploy 20 personnel as well as heavy equipment to accelerate our work," he mentioned, Thursday (2/13).
SDA Repairs Jalan Dr. Saharjo Channel's Retaining WallAfter installing dolken woods, his side will strengthen the foundation using concrete because its location is on the edge of arterial road which often passed by high tonnage vehicles.
"Our target is to finish the repair next month," he closed.