Sodetan Construction on Untung Jawa Island Completed
access_time March 29 2020 02:47 PM remove_red_eye 942
Reported by Suparni | Translated by Nugroho Adibrata
Reported by Suparni | Translated by Nugroho Adibrata
Sodetan is connected to the absorption well that is on the main road
The a crossing channel or locally known as sodetan construction in SDN 02 area, Untung Jawa Island, Thousand Islands, finally completed, on Saturday (3/28).
"Sodetan is connected to the absorption well that is on the main road," expressed Thousand Islands Water Resources Sub-agency Head, Abdul Rauf, Sunday (3/29).
Cilincing People Affected by Sodetan Work Relocated to Marunda FlatsUntung Jawa Island Urban Village Head Supriyadi said it was made to anticipate flood when it rains.
"Hopefully it can optimally minimize flood during rainy season, as its location is a basin," he stated.