You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Sodetan di Pulau Untung Jawa Rampung

Sodetan Construction on Untung Jawa Island Completed

Sodetan is connected to the absorption well that is on the main road

The a crossing channel or locally known as sodetan construction in SDN 02 area, Untung Jawa Island, Thousand Islands, finally completed, on Saturday (3/28).

"Sodetan is connected to the absorption well that is on the main road," expressed Thousand Islands Water Resources Sub-agency Head, Abdul Rauf, Sunday (3/29).

Cilincing People Affected by Sodetan Work Relocated to Marunda Flats

Untung Jawa Island Urban Village Head Supriyadi said it was made to anticipate flood when it rains.

"Hopefully it can optimally minimize flood during rainy season, as its location is a basin," he stated.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye868 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye357 personAldi Geri Lumban Tobing
close