You don't have javascript enabled. Good luck with that.
Pencarian
Rumah Pompa
.
photo Yopie Oscar - Beritajakarta.id

3 Pump Houses will Be Built in North Jakarta

To anticipate flood in Kelapa Gading, North Jakarta, local water management public works sub-department is going to build three pump houses next year. According to the plan, these pump houses will be built at the end of Betik River in Kampung Kandang as well as around Artha Gading connecting channel (PHB) and Mati River.

The pump houses will be equipped with two pumps powered 0.5 cubic meter per second. Later, the pumps will flow water to Sunter River to be flown to the sea

As known, Kelapa Gading area was flooded during rainy season in last January-February. The roads there, like Jalan Boulevard Raya, Jalan Boulevard Barat, Jalan Boulevard Utara, and Jalan Raya Kelapa Hibrida, were inundated for as high 30-100 centimeters. The flood was finally receded after a week and caused loss reaching billions of rupiah.

“The pump houses will be equipped with two pumps powered 0.5 cubic meter per second. Later, the pumps will flow water to Sunter River to be flown to the sea. Hopefully with that, Kelapa Gading area could be free from flood,” stated Head of North Jakarta Water Management Public Works Sub-Department, Wagiman Silalahi, Monday (9/29).

5 Pump Houses will Be Built Soon

According to Silalahi, the budget needed to build those pump houses and for the pumps procurement is predicted to reach Rp 30 billion.

Meanwhile, Head of Water Resources Maintenance Section for North Jakarta Water Management Public Works Sub-Department, Kuryatna Atmaja, informed that the dredging of water channels in Kelapa Gading keeps being accelerated.

Even so, he assessed that it is actually not enough. This is because based on last year’s experience, the water came from East Jakarta area which caused Sunter River water overflowed to Kelapa Gading area. As a result, Kelapa Gading got inundated for quite long.

“After we look for the problem’s root, the flood happened because of overflow water from Sunter River. That’s why, besides normalizing water channels, new pump houses will also be built,” he uttered.

Linked News
Popular News indeks
  1. Pramono Prioritizes Construction of Cakung Regional Hospital

    access_time18-04-2025 remove_red_eye468 personFakhrizal Fakhri
  2. Governor Pramono Joins Cycling in Jakarta Silaturahride 2025

    access_time19-04-2025 remove_red_eye408 personBudhi Firmansyah Surapati
  3. Free Transportation Services to Facilitate Residents' Mobility

    access_time17-04-2025 remove_red_eye317 personDessy Suciati
  4. Jakarta to Make Public Transportation Free on April 24, 2025

    access_time18-04-2025 remove_red_eye313 personAldi Geri Lumban Tobing
  5. City Goverment Encourages Residents to Use Public Transportation

    access_time21-04-2025 remove_red_eye281 personFakhrizal Fakhri

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik