Repair on Jl. Gabus Pasar Minggu Water Channel Keeps Accelerated
access_time April 11 2020 06:12 PM remove_red_eye 1096
Reported by Mustaqim Amna | Translated by Maria Inggita
Reported by Mustaqim Amna | Translated by Maria Inggita
South Jakarta Water Resources (SDA) accelerates the repair of water channel as long as 373 meters
on Jalan Gabus, at Navy (AL) Complex, RT 05/08, Pasar Minggu, South Jakarta to anticipate inundation when the rain falls.We repair it since September 2019 and target it to finish in the end of May 2020
South Jakarta SDA's Maintenance Section Head, Junjung said, channel's repair has reached 85 percent until today.
"We repair it since September 2019 and target it to finish in the end of May 2020. It involves 10 personnel in this repair," he explained, Saturday (4/11).
South Jakarta SDA Builds Water Channel in CiganjurIn this repair, the channel will be widened by installing 311 U-Ditch units with size 100 x 60 centimeters and 19 culvert box units using one excavator and one dump truck to transport the material.
"Hopefully, through this repair, we can build a systematic water channel that can integrate with the other channels," he conveyed.