You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Saluran di Jalan Gabus Pasar Minggu Dipercepat

Repair on Jl. Gabus Pasar Minggu Water Channel Keeps Accelerated

South Jakarta Water Resources (SDA) accelerates the repair of water channel as long as 373 meters on Jalan Gabus, at Navy (AL) Complex, RT 05/08, Pasar Minggu, South Jakarta to anticipate inundation when the rain falls.

We repair it since September 2019 and target it to finish in the end of May 2020

South Jakarta SDA's Maintenance Section Head, Junjung said, channel's repair has reached 85 percent until today.

"We repair it since September 2019 and target it to finish in the end of May 2020. It involves 10 personnel in this repair," he explained, Saturday (4/11).

South Jakarta SDA Builds Water Channel in Ciganjur

In this repair, the channel will be widened by installing 311 U-Ditch units with size 100 x 60 centimeters and 19 culvert box units using one excavator and one dump truck to transport the material.

"Hopefully, through this repair, we can build a systematic water channel that can integrate with the other channels," he conveyed.

Linked News
Popular News indeks
  1. Nighttime Surveillance on Railroad Banks of Jalan I Gusti Ngurah Rai Intensified

    access_time08-05-2026 remove_red_eye2634 personNurito
  2. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2359 personTiyo Surya Sakti
  3. Governor Pram Appreciates Residents for Keeping Jakarta Safe and Comfortable

    access_time09-05-2026 remove_red_eye979 personFolmer
  4. Telkomsel Digiland Run 2026 Parking Lot List: Check Now!

    access_time14-05-2026 remove_red_eye924 personAldi Geri Lumban Tobing
  5. Waste Sorting Movement Boosts Circular Economy

    access_time12-05-2026 remove_red_eye844 personFakhrizal Fakhri