You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Saluran di Jalan Gabus Pasar Minggu Dipercepat

Repair on Jl. Gabus Pasar Minggu Water Channel Keeps Accelerated

South Jakarta Water Resources (SDA) accelerates the repair of water channel as long as 373 meters on Jalan Gabus, at Navy (AL) Complex, RT 05/08, Pasar Minggu, South Jakarta to anticipate inundation when the rain falls.

We repair it since September 2019 and target it to finish in the end of May 2020

South Jakarta SDA's Maintenance Section Head, Junjung said, channel's repair has reached 85 percent until today.

"We repair it since September 2019 and target it to finish in the end of May 2020. It involves 10 personnel in this repair," he explained, Saturday (4/11).

South Jakarta SDA Builds Water Channel in Ciganjur

In this repair, the channel will be widened by installing 311 U-Ditch units with size 100 x 60 centimeters and 19 culvert box units using one excavator and one dump truck to transport the material.

"Hopefully, through this repair, we can build a systematic water channel that can integrate with the other channels," he conveyed.

Linked News
Popular News indeks
  1. Fire at Pondok Bambu Allegedly Triggered by Electrical Short

    access_time19-05-2026 remove_red_eye1384 personNurito
  2. Governor Pramono Named Vice Chair of C40 Cities Steering Committee

    access_time18-05-2026 remove_red_eye1014 personAldi Geri Lumban Tobing
  3. Inundation on DI Panjaitan Road Recede

    access_time20-05-2026 remove_red_eye845 personNurito
  4. Dharma Jaya Ready for Thousands of Eid al-Adha Sacrifices

    access_time20-05-2026 remove_red_eye652 personAldi Geri Lumban Tobing
  5. Rasuna Said Car-Free Day to Return in June 2026

    access_time16-05-2026 remove_red_eye634 personAldi Geri Lumban Tobing