You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Saluran di Jalan Gabus Pasar Minggu Dipercepat
.
photo Mustaqim Amna - Beritajakarta.id

Repair on Jl. Gabus Pasar Minggu Water Channel Keeps Accelerated

South Jakarta Water Resources (SDA) accelerates the repair of water channel as long as 373 meters on Jalan Gabus, at Navy (AL) Complex, RT 05/08, Pasar Minggu, South Jakarta to anticipate inundation when the rain falls.

We repair it since September 2019 and target it to finish in the end of May 2020

South Jakarta SDA's Maintenance Section Head, Junjung said, channel's repair has reached 85 percent until today.

"We repair it since September 2019 and target it to finish in the end of May 2020. It involves 10 personnel in this repair," he explained, Saturday (4/11).

South Jakarta SDA Builds Water Channel in Ciganjur

In this repair, the channel will be widened by installing 311 U-Ditch units with size 100 x 60 centimeters and 19 culvert box units using one excavator and one dump truck to transport the material.

"Hopefully, through this repair, we can build a systematic water channel that can integrate with the other channels," he conveyed.

Linked News
Popular News indeks
  1. 1,262 Personnel Ready to Support Bhayangkara Anniversary Cleanliness

    access_time30-06-2025 remove_red_eye572 personAldi Geri Lumban Tobing
  2. UK Royal Marine Band Enlivens Jakarta Anniversary

    access_time27-06-2025 remove_red_eye559 personDessy Suciati
  3. 19,675 People Visit Ragunan Zoo on Islamic New Year

    access_time27-06-2025 remove_red_eye470 personTiyo Surya Sakti
  4. Transjakarta Wins Award for Best GCG Company

    access_time27-06-2025 remove_red_eye390 personAldi Geri Lumban Tobing
  5. Video Mapping and Dancing Fountain Entertain Monas Visitors

    access_time27-06-2025 remove_red_eye390 personBudhi Firmansyah Surapati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik