You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Saluran di Jalan Gabus Pasar Minggu Dipercepat

Repair on Jl. Gabus Pasar Minggu Water Channel Keeps Accelerated

South Jakarta Water Resources (SDA) accelerates the repair of water channel as long as 373 meters on Jalan Gabus, at Navy (AL) Complex, RT 05/08, Pasar Minggu, South Jakarta to anticipate inundation when the rain falls.

We repair it since September 2019 and target it to finish in the end of May 2020

South Jakarta SDA's Maintenance Section Head, Junjung said, channel's repair has reached 85 percent until today.

"We repair it since September 2019 and target it to finish in the end of May 2020. It involves 10 personnel in this repair," he explained, Saturday (4/11).

South Jakarta SDA Builds Water Channel in Ciganjur

In this repair, the channel will be widened by installing 311 U-Ditch units with size 100 x 60 centimeters and 19 culvert box units using one excavator and one dump truck to transport the material.

"Hopefully, through this repair, we can build a systematic water channel that can integrate with the other channels," he conveyed.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1119 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye605 personDessy Suciati
  3. Jakarta Steps Up to the Plate as PON 2028’s Support System

    access_time24-06-2026 remove_red_eye558 personFakhrizal Fakhri
  4. Jakarta Light Festival Dazzles Visitors at Kota Tua

    access_time22-06-2026 remove_red_eye545 personBudhi Firmansyah Surapati
  5. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye529 personNurito