You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Saluran di Jalan Gabus Pasar Minggu Dipercepat

Repair on Jl. Gabus Pasar Minggu Water Channel Keeps Accelerated

South Jakarta Water Resources (SDA) accelerates the repair of water channel as long as 373 meters on Jalan Gabus, at Navy (AL) Complex, RT 05/08, Pasar Minggu, South Jakarta to anticipate inundation when the rain falls.

We repair it since September 2019 and target it to finish in the end of May 2020

South Jakarta SDA's Maintenance Section Head, Junjung said, channel's repair has reached 85 percent until today.

"We repair it since September 2019 and target it to finish in the end of May 2020. It involves 10 personnel in this repair," he explained, Saturday (4/11).

South Jakarta SDA Builds Water Channel in Ciganjur

In this repair, the channel will be widened by installing 311 U-Ditch units with size 100 x 60 centimeters and 19 culvert box units using one excavator and one dump truck to transport the material.

"Hopefully, through this repair, we can build a systematic water channel that can integrate with the other channels," he conveyed.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye786 personAldi Geri Lumban Tobing
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye785 personAldi Geri Lumban Tobing
  3. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye768 personBudhi Firmansyah Surapati
  4. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye619 personAldi Geri Lumban Tobing
  5. Drainage Normalization on Jalan Mandioli to Be Completed in October

    access_time28-08-2026 remove_red_eye458 personFolmer