You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Kali Cijantung Rampung
.
photo Nurito - Beritajakarta.id

Cijantung River Sheet Pile Repair Finally Completed

It has been ongoing since two weeks and today is completed

The Cijantung River sheet pile repair work in RT 05/05, Cijantung Urban Village, Pasar Rebo has finally completed today, Thursday (9/24).

Pasar Rebo Sub-district Vice Head Santoso said it was carried out as the sheet pile experienced collapse due to scouring of water.

94 Drainage Points Repaired in North Jakarta

"It has been ongoing since two weeks and today is completed," he expressed, Thursday (9/24).

To repair the sheet pile as long as 20 meters with 3 meters high, his party sent seven personnel of East Jakarta Water Resources (SDA) Task Force to the location.

"Repair is done by installing a gabion to make sheet pile stronger, which aims to withstand inundation and flooding in the region," he stated.

Linked News
Popular News indeks
  1. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye359 personTiyo Surya Sakti
  2. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye329 personAldi Geri Lumban Tobing
  3. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye320 personAldi Geri Lumban Tobing
  4. Council Urges Free School Programs to Prioritize Principles of Fairness and Quality

    access_time18-07-2025 remove_red_eye291 personFakhrizal Fakhri
  5. C. Jakarta TP PKK Grows 2,470 Chili and Tomato Seedlings

    access_time18-07-2025 remove_red_eye289 personFolmer

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik