You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Kali Cijantung Rampung

Cijantung River Sheet Pile Repair Finally Completed

It has been ongoing since two weeks and today is completed

The Cijantung River sheet pile repair work in RT 05/05, Cijantung Urban Village, Pasar Rebo has finally completed today, Thursday (9/24).

Pasar Rebo Sub-district Vice Head Santoso said it was carried out as the sheet pile experienced collapse due to scouring of water.

94 Drainage Points Repaired in North Jakarta

"It has been ongoing since two weeks and today is completed," he expressed, Thursday (9/24).

To repair the sheet pile as long as 20 meters with 3 meters high, his party sent seven personnel of East Jakarta Water Resources (SDA) Task Force to the location.

"Repair is done by installing a gabion to make sheet pile stronger, which aims to withstand inundation and flooding in the region," he stated.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1555 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1427 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1294 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1089 personNurito
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye960 personDessy Suciati