You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Kali Cijantung Rampung

Cijantung River Sheet Pile Repair Finally Completed

It has been ongoing since two weeks and today is completed

The Cijantung River sheet pile repair work in RT 05/05, Cijantung Urban Village, Pasar Rebo has finally completed today, Thursday (9/24).

Pasar Rebo Sub-district Vice Head Santoso said it was carried out as the sheet pile experienced collapse due to scouring of water.

94 Drainage Points Repaired in North Jakarta

"It has been ongoing since two weeks and today is completed," he expressed, Thursday (9/24).

To repair the sheet pile as long as 20 meters with 3 meters high, his party sent seven personnel of East Jakarta Water Resources (SDA) Task Force to the location.

"Repair is done by installing a gabion to make sheet pile stronger, which aims to withstand inundation and flooding in the region," he stated.

Linked News
Popular News indeks
  1. Jakarta Builds Five New Animal Health Centers to Expand Veterinary Services

    access_time30-09-2026 remove_red_eye489 personAldi Geri Lumban Tobing
  2. Buildings on the Sidewalk in Front of Plumpang Transjakarta Bus Stop Demolished

    access_time30-09-2026 remove_red_eye406 personAnita Karyati
  3. Transjakarta Reaffirms Ban on Busking in Mikrotrans and Bus Stops

    access_time02-10-2026 remove_red_eye356 personAldi Geri Lumban Tobing
  4. Jakarta Penuh Warna Edition 3 Highlights Harmony in Diversity

    access_time27-09-2026 remove_red_eye312 personAldi Geri Lumban Tobing
  5. Commission D Supports Reserve Fund for Long-Term Infrastructure

    access_time02-10-2026 remove_red_eye294 personFakhrizal Fakhri