You don't have javascript enabled. Good luck with that.
Pencarian
Grebek Lumpur di Gang Macan Rampung

Channel Dredging Work on Gang Macan Completed

Channel dredging which carried out on Gang Macan, RT 10/01, Kedoya Utara, Kebon Jeruk has completed.

Dredging is carried out to anticipate inundation and flooding, and now it is completed

Kedoya Utara Urban Village Head, Tubagus Masarul Iman mentioned, West Jakarta Water Resources (SDA) Sub-agency personnel has started dredging work since September 31.

"Dredging is carried out to anticipate inundation and flooding, and now it is completed," he said, Monday (10/19).

SDA Personnel Clean Channel on Jl. Kesatriaan 8 Kebon Manggis

This channel has length of 250 meters, width of 100 centimeters, and depth of 200 centimeters.

As many as 30 SDA Sub-agency were deployed to dredge it. Every day, they collected 300 sacks full of mud sedimentation and garbage from the channel.

"Total we have collected 4,400 sacks full of mud and garbage. I hope residents can take a part in maintaining cleanliness of the channel," he asserted.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1437 personFolmer
  2. Central Jakarta Government Responds Quickly to Fire Victims in Tanah Tinggi

    access_time04-06-2026 remove_red_eye964 personFolmer
  3. Jakarta Waives Motor Vehicle Tax Fines and Title Transfer Fees

    access_time01-06-2026 remove_red_eye869 personAldi Geri Lumban Tobing
  4. Traffic Measures Prepared to Ease Congestion Around GBK This Weekend

    access_time04-06-2026 remove_red_eye683 personAldi Geri Lumban Tobing
  5. Commemorating Vesak, Jakarta Lights Up with Illumination of Jakarta 2026

    access_time30-05-2026 remove_red_eye667 personBudhi Firmansyah Surapati