You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaksel Keruk Lumpur Saluran PHB Kalibata
.
photo TP Moan Simanjuntak - Beritajakarta.id

Kalibata Connecting Channel in South Jakarta Dredged

The South Jakarta Water Resources (SDA) Sub-agency is dredging up mud sediment in the Kalibata connecting channel, Pancoran today, Friday (10/16).

It has been ongoing since Monday (10/12) and is targeted to be complete in November

Drainage Maintenance Division Head Junjung said, to maximize the work, as many as six officers, two excavators and three truck dumps had been alerted at the location.

"It has been ongoing since Monday (10/12) and is targeted to be complete in November," he told, Friday (10/16).

59 Blue Team Personnel Sent to Dredge Up Drains in Tanah Abang

He described the channel that crossed the DPR-RI Office Housing Complex had 400 meters length and 7 meters width. From 400 meters length, 100 meters were covered already by parks and bridges thus dredging could not done.

"The depth of the dredged mud reaches one to one and a half meters," he concluded.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye866 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye422 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye369 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye354 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye345 personAldi Geri Lumban Tobing
close