You don't have javascript enabled. Good luck with that.
Pencarian
Wali Kota Jaktim Tinjau Embung Wira Jasa Cipinang Melayu
.
photo Nurito - Beritajakarta.id

East jakarta Mayor Monitors Wira Jasa Retention Basin Construction Process

Today, East Jakarta Mayor, Muhammad Anwar monitored Wira Jasa Retention Basin (Embung) construction process in Cipinang Melayu, Makasar.

Currently, Wira Jasa Retention Basin construction reaches 60 percent

In this monitoring, his side also accompanied by East Jakarta TP PKK Head, Diah Anwar; East Jakarta Assistant for Economy and Development, Kusmanto; Makasar Sub-district Head, Kamal Alatas; and Cipinang Melayu Urban Village Head, Agus Sulaeman.

"Currently, Wira Jasa Retention Basin construction reaches 60 percent," Anwar said, Wednesday (11/11)

Construction of Wirajasa Retention Basin Reaches 30 Percent

Even though it is still under construction, its existence is expected to minimize inundation in the region.

Because it is proven that when water level at Sunter Hulu reached Alert 2 status, residential areas in RW 06, RW 07 and RW 08 that were usually flooded, but now they are no longer flooded.

"Its construction is targeted to finish in the end of December," he asserted.

This retention basin is not only used as reservoir and flood control, but also one of water tourism destinations in East Jakarta.

Thus, his side will arrange and beautify this area to make it more beautiful and comfortable to be visited by residents or tourists.

"At least, around this retention basin will be plated with typical betawi plants such as Kecapi, Jamblang, Rambutan, Dukuh Condet, and others," he explained.

Linked News
Popular News indeks
  1. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye795 personBudhi Firmansyah Surapati
  2. W. Jakarta SDA Constructs Channel on Jalan Nurul Muslimin I Kembangan

    access_time04-11-2024 remove_red_eye780 personTP Moan Simanjuntak
  3. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye479 personFolmer
  4. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye377 personBudhi Firmansyah Surapati
  5. 104 Wild Cats in Kebayoran Lama Sterilized

    access_time07-11-2024 remove_red_eye345 personTiyo Surya Sakti