You don't have javascript enabled. Good luck with that.
Pencarian
 Pembuatan Tanggul Penahan Rob di Pulau Panggang Rampung

Tidal Embankment Construction on Panggang Island Completed

We need to anticipate tidal floods from residential areas

The Thousand Islands Water Resources (SDA) Sub-agency, finally completed the construction of tidal embankments in two locations in Panggang Iskand Urban Village, North Thousand Islands Sub-district. It was made using sacks filled with sand.

Thousand Islands SDA Sub-agency Head Abdul Rouf said it was made in early December in RW 03 along 17.50 meters with 1 meter height and in RW 01 along 7.60 meters with 1 meters height.

Council Wants SDA Dept. to Handle Muara Angke Embankment Renovation

"We need to anticipate tidal floods from residential areas," he expressed, Friday (12/4).

In the meantime, Panggang Island Urban Village Head Pepen Kuswandi expressed, his embankment was very important, as the region was prone to inundation and flooding when the water was high.

"We are going to evaluate it again, if the flood occurs frequently, we'll raise the embankment," he stated.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1705 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1478 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1334 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1118 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye814 personDessy Suciati