You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Jl Tongkol Ancol Dikuras

Ancol SDA Unit Dredges Channel on Jl. Tongkol

North Jakarta Water Resources (SDA) Sub-agency dredged channel located on Jalan Tongkol, RT 09/01, Ancol, Pademangan.

We started the work this morning. Hopefully it can be finished this afternoon

Ancol Sub-district SDA Unit Head, Slamet Riyanto mentioned, mud dredging was carried out to anticipate inundation when the rain falls. Moreover the channel was mostly covered by mud.

"This channel has width of 80 centimeters and depth of 1.2 meters. While the mud's thickness reaches 1 meter. It causes the channel can't be optimal to drain water," he explained, Wednesday (12/9).

Channel Construction Work on Jalan Sulaiman Reaches 70 Percent

In this dredging work, his side deployed 9 personnel to dredge mud manually. Now its progress has reached 500 meters.

"We started the work this morning. Hopefully it can be finished this afternoon," he said.

Linked News
Popular News indeks
  1. Volcanic Ash Reaches Jakarta, Health Agency Calls for Protective Measures

    access_time06-09-2026 remove_red_eye1609 personBudhi Firmansyah Surapati
  2. Jakartans Urged to Stay Calm and Take Precautions Amid Mt. Anak Krakatau Volcanic Ash

    access_time06-09-2026 remove_red_eye804 personBudhi Firmansyah Surapati
  3. Jakarta Provincial Government Anticipates the Impact of Volcanic Ash from Mount Anak Krakatau

    access_time06-09-2026 remove_red_eye661 personFolmer
  4. Jakarta BPBD Urges Residents to Prepare for Meteorological Drought

    access_time04-09-2026 remove_red_eye571 personAldi Geri Lumban Tobing
  5. Jakarta Reallocates Funds for Rp 250M Suckermouth Catfish Study After Pramono’s Direct Order

    access_time10-09-2026 remove_red_eye564 personFakhrizal Fakhri