You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Jl Tongkol Ancol Dikuras

Ancol SDA Unit Dredges Channel on Jl. Tongkol

North Jakarta Water Resources (SDA) Sub-agency dredged channel located on Jalan Tongkol, RT 09/01, Ancol, Pademangan.

We started the work this morning. Hopefully it can be finished this afternoon

Ancol Sub-district SDA Unit Head, Slamet Riyanto mentioned, mud dredging was carried out to anticipate inundation when the rain falls. Moreover the channel was mostly covered by mud.

"This channel has width of 80 centimeters and depth of 1.2 meters. While the mud's thickness reaches 1 meter. It causes the channel can't be optimal to drain water," he explained, Wednesday (12/9).

Channel Construction Work on Jalan Sulaiman Reaches 70 Percent

In this dredging work, his side deployed 9 personnel to dredge mud manually. Now its progress has reached 500 meters.

"We started the work this morning. Hopefully it can be finished this afternoon," he said.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1446 personFolmer
  2. Central Jakarta Government Responds Quickly to Fire Victims in Tanah Tinggi

    access_time04-06-2026 remove_red_eye974 personFolmer
  3. Jakarta Waives Motor Vehicle Tax Fines and Title Transfer Fees

    access_time01-06-2026 remove_red_eye880 personAldi Geri Lumban Tobing
  4. Traffic Measures Prepared to Ease Congestion Around GBK This Weekend

    access_time04-06-2026 remove_red_eye783 personAldi Geri Lumban Tobing
  5. Public Urged to Use Public Transit for GBK Events to Avoid Heavy Traffic

    access_time05-06-2026 remove_red_eye690 personAldi Geri Lumban Tobing