You don't have javascript enabled. Good luck with that.
Pencarian
 Antisipasi Genangan, Satpel SDA Tanjung Priok Keruk Saluran Phb Danau Indah Barat

Danau Indah Barat Connecting Channel Dredged

Tanjung Priok Sub-district Water Resources Unit dredged mud sedimentation from Danau Indah Barat connecting (phb) channel, Sunter Jaya Urban Village, Tanjung Priok Sub-district, North Jakarta.

Dredging starts today and is targeted to complete in early April 2021

Tanjung Priok Sub-district SDA Unit Head, Deny Tri Hendarto mentioned, dredging was carried out to normalize Danau Indah Barat connecting channel thus it can be optimal in function and hold more water.

"Dredging starts today and is targeted to complete in early April 2021," he conveyed, Wednesday (3/17).

Rawa Kepa Connecting River Being Dredged for Maximum Water Capacity

Danau Indah Barat connecting channel has length of 550 meters, width of 2.5 meters, and depth of 2.5 meters with mud thickness of one meter.

"In this dredging, we use one wheel excavator and three dump trucks. We also deploy three Tanjung Priok SDA Unit to dredge this connecting channel," he explained.

Through dredging, his side hopes connecting channel can hold more water, especially when heavy rain falls thus it can minimize inundation.

Linked News
Popular News indeks
  1. Pramono Flags Off 10,000 Runners at Soekarno Run 2026

    access_time15-02-2026 remove_red_eye1056 personFolmer
  2. Jakarta Unveils Indonesia’s First SDGs Corner at Maritime Museum

    access_time15-02-2026 remove_red_eye992 personNurito
  3. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye964 personAldi Geri Lumban Tobing
  4. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye919 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye704 personAldi Geri Lumban Tobing