You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Embung Belibis di Semper Barat, Cilincing, Jakut Sudah Mencapai 70 Persen
.
photo Rezki Apriliya Iskandar - Beritajakarta.id

Progress of Belibis Retention Basin Construction has Reached 70 Percent

Belibis Retention Basin (Embung) construction progress now has reached 70 percent. It is located behind Lokbin Semper Public Housing, RW 04, Semper Barat Urban Village, Cilincing, North Jakarta. This retention basin is expected to control flood in the area.

We deploy 2 amphibious units, 3 excavator units belonging to SDA, and 1 excavator unit belonging to private companies

Cilincing Sub-district Water Resources (SDA) Unit Head, Tjahyono Budi Setiawan mentioned, this construction work has been carried out since October 24, 2020 and is targeted to be completed in April 2021.

"Current progress has reached 70 percent. But it is hampered due to pipeline owned by Pertamina. We continue to communicate and coordinate with Pertamina to find the solution," he said, Thursday (3/25).

Pesakih Public Housing Retention Basin Construction is Almost Completed

For the construction, his side collaborates with number of CSR companies, namely PT. Kawasan Berikat Nusantara (Persero), PT. Justus Sakti Raya, PT. Komatsu Indonesia, and PT. Superkrane Mitra Utama Tbk. Belibis Retention Basin is built on an area of 3.8 hectares which connected to Gubuk Genteng River and Sepatan River that leads to Cakung Drain.

"Dam width is 5 meters with depth 1.5 meters. While retention basin's depth is about 6 meters," he explained.

His side operated several heavy equipment to dredge mud, tidy up retention basin, and build dam.

"We deploy 2 amphibious units, 3 excavator units belonging to SDA, and 1 excavator unit belonging to private companies. We also deploy 2 operators from private companies and 10 Cilincing SDA Unit personnel," he informed.

Belibis Retention Basin is built to overcome flood and expected to hold more water in the surrounding area. It is also planned to be ecotourism area as citizen interaction place.

"According to plan, we will also build jogging track, culinary area, and green open space (RTH) in this location," he stated.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1503 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye925 personAldi Geri Lumban Tobing
  3. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye392 personFolmer
  4. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye389 personDessy Suciati
  5. 13 Inter-village Bridges in South Jakarta Revitalized

    access_time16-01-2025 remove_red_eye367 personTiyo Surya Sakti