You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan RSUD Budi Asih Rampung Akhir Desember

2 Budhi Asih RSUD Buildings Ready By the End of December

The construction project of two buildings of Budhi Asih Regional Hospitals (RSUD), Kramatjati, East Jakarta, is predicted to complete by the end of December this year. Both hospitals are hoped can already operate in January 2015.

We hope the buildings can be operated in early January 2015

"We hope the buildings can be operated in early January 2015," expressed Head of Budhi Asih RSUD Public Relation, Hamonangan Sirait, Thursday (11/13).

Sirait disclosed, such new buildings would have 200 inpatient rooms for third-class patient and 14 healthcare clinics. Thereby, it can accommodate the number of patients who reached 1,200-2,000 per day.

Tarakan RSUD Patients Enthusiast in Casting Their Votes

He hoped healthcare service in East Jakarta can be optimized. All this time, the number of patients keep increasing thus additional facility needed. 

As quoted beritajakarta.com, hundreds of workers are constructing the building that almost completed 95 percent. Currently, the construction is still in the process of finishing and installation of building window glass.

Linked News
Popular News indeks
  1. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye585 personAldi Geri Lumban Tobing
  2. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye557 personAldi Geri Lumban Tobing
  3. Pramono Confirms Permanent Bridge to Be Built in Tegal Alur

    access_time29-08-2026 remove_red_eye456 personDessy Suciati
  4. Jakarta Fine Arts and Ceramics Museum Hosts Malangan Exhibition

    access_time29-08-2026 remove_red_eye452 personFakhrizal Fakhri
  5. Pramono Emphasizes Importance of Creative Spaces for Children

    access_time03-09-2026 remove_red_eye428 personDessy Suciati