You don't have javascript enabled. Good luck with that.
Pencarian
Dinas SDA Bangun Dua Waduk Besar di Area Makam TPU Rorotan
.
photo Suparni - Beritajakarta.id

Two Reservoirs Construction Work at TPU Rorotan Enters Land Dredging Stage

Construction progress of two reservoirs at Rorotan Public Cemetery (TPU), RW 09, Rorotan Urban Village, Cilincing Sub-disrict, North Jakarta, has entered land dredging stage.

Reservoir is built to prevent inundation in TPU Rorotan

Cilincing Sub-disrict Water Resources (SDA) Unit Head, Tjahyono Budi Setiawan conveyed, his side planned to build reservoirs as wide as 1 hectare in east side and 2 hectares in west side which separated by inspection road.

"Reservoir is built to prevent inundation in TPU Rorotan. Reservoirs will be a storage of water system in public cemetery, which later be channeled to Gendong River, then to East Flood Canal (KBT)," he explained, Friday (8/13).

SDA UPT Alkal Assists With Earthwork at Rorotan Public Cemetery

For this work, he added, his side deployed 15 heavy equipment and 22 personnel consisting of 15 heavy equipment operators, 5 personnel on duty and 2 supervisors.

"It has been started since July 2021. We are targeting it to finish in December. Its construction uses APBD (city budget)," he mentioned.

He stated that TPU Rorotan which is currently being used for COVID-19 bodies covers an area of 25 hectares. Not only reservoirs, but TPU Rorotan will be also equipped with supporting facilities.

"Bina Marga is currently compacting the soil and building access road to the reservoir to facilitate material and people's mobility," he closed.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1065 personAldi Geri Lumban Tobing
  2. Parekraf Agency Introduces Jakarta as a Global City at IBTM World 2024

    access_time23-11-2024 remove_red_eye933 personAldi Geri Lumban Tobing
  3. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye928 personFolmer
  4. Jakarta Baznas Bazis Ready to Support Disaster Preparedness

    access_time25-11-2024 remove_red_eye760 personAldi Geri Lumban Tobing
  5. Gubernatorial Election Logistics in Seribu Island Distributed

    access_time26-11-2024 remove_red_eye580 personBudhi Firmansyah Surapati