You don't have javascript enabled. Good luck with that.
Pencarian
Penataan Trotoar di Jl Layur Pulogadung Rampung

Sidewalk Arrangement Work on Jl. Layur Pulogadung is Completed

Sidewalk arrangement along 912 meters with average width of 2.3 meters on Jl. Layur, RW 11 Jati Urban Village, Pulogadung, East Jakarta which started from June 15, has now been completed.

This is a part of mayor's KSD

East Jakarta Bina Marga Sub-agency's Road and Bridge Section Head, Budi Cahyo stated, this sidewalk arrangement is one of East Jakarta Mayor's Regional Strategic Activity (KSD). Previously, its condition was severely damaged with many potholes.

"This is a part of mayor's KSD, because previously many parts of the sidewalk were damaged," he mentioned, Thursday (10/21).

Collapsed Sheet Pile on Jalan Kramat Kwitang Nomor 9 Being Repaired

This sidewalk arrangement work, he added, was carried out from intersection of Jl. Pemuda to the gate of Ministry of Finance Complex RW 11, Jati Urban Village, costing around Rp  2,414,222,000 from APBD 2021.

His side provided land in several sidewalks points in front of Layur Public Cemetery (TPU) for tree planting carried out by East Jakarta City Park and Forestry Sub-agency to make it greener.

Linked News
Popular News indeks
  1. BTN JAKIM 2026: Pramono Invites Everyone to Have Fun While Running

    access_time13-06-2026 remove_red_eye852 personFakhrizal Fakhri
  2. Ancol Offers Free Entry for Three Days

    access_time13-06-2026 remove_red_eye408 personAnita Karyati
  3. South Jakarta Strengthens Efforts to Boost Regional Tax Revenue

    access_time15-06-2026 remove_red_eye352 personTiyo Surya Sakti
  4. Education Agency: Student Admissions to be Objective, Transparent, and Inclusive

    access_time15-06-2026 remove_red_eye346 personAldi Geri Lumban Tobing
  5. 54 Vehicles Undergo Free Emissions Testing at Mitra Praja Sunter

    access_time15-06-2026 remove_red_eye341 personAnita Karyati