You don't have javascript enabled. Good luck with that.
Pencarian
Saluran PHB Bisma Raya Dikeruk

SDA Dredges Bisma Raya Connecting Channel

North Jakarta Water Resources (SDA) Sub-agency dredged Bisma Raya Connecting (Phb) Channel on Jalan Bisma Raya, RW 19, Sunter Agung Urban Village, Tanjung Priok Sub-district.

It is targeted to be completed in November

Tanjung Priok Sub-district SDA Unit Head, Deny Tri Hendiarto stated, this connecting channel has length of 507 meters and width of 4 meters.

Pulo Nangka and Pulomas Horse Race Connecting Channels Dredged

"It's depth is actually 2 meters. But it is silting due to mud sedimentation with thickness around 70 centimeters," he said, Wednesday (10/27).

According to him, dredging work on Bisma Raya Phb Channel has been carried out since October 2021 by deploying 1 excavator and 3 dump trucks.

"It is targeted to be completed in November. Hopefully, this mud dredging can optimize water flow to Sunter Utara Reservoir. Thus it can prevent inundation or flood," he conveyed.

Linked News
Popular News indeks
  1. Transjakarta Adjusts Operations Due to Public Demonstration

    access_time12-06-2026 remove_red_eye1417 personAldi Geri Lumban Tobing
  2. Pramono Launches Jumbo Biopores, Aims for Jakarta Waste Management Blueprint

    access_time07-06-2026 remove_red_eye1009 personDessy Suciati
  3. Pramono: Transjabodetabek Fare Adjustment Based on Careful Consideration

    access_time10-06-2026 remove_red_eye988 personDessy Suciati
  4. BTN JAKIM 2026, Traffic Engineering and Alternative Routes Provided

    access_time11-06-2026 remove_red_eye783 personAldi Geri Lumban Tobing
  5. Accelerating Jakarta`s Global City Development, Pramono Inaugurates Urban Knowledge Hub

    access_time08-06-2026 remove_red_eye681 personDessy Suciati