You don't have javascript enabled. Good luck with that.
Pencarian
Kelurahan Cipinang Melayu Siapkan Pengungsian Warga Terdampak Banjir

Cipinang Melayu Prepares Evacuation for People Affected by Flood

The refugees will continue to rise tonight. That's why we will move tents to the Borobudur University Hall

Cipinang Melayu Urban Village, Makasar, East Jakarta has prepared evacuation sites for 150 residents in RW 03 and 04 affected by flooding, on Monday (11/1) night.

Since this afternoon, residents' homes have been inundated as high as 60 cm due to heavy rains which caused the overflow of the Sunter River. 

Residents Affected by Flood in Rambutan Urban Village Have Been Evacuated

Cipinang Melayu Urban Village Head, Arroyantoro said, the river started to overflow at around 5 PM. Initialy it was only 20 cm high but continued to rise about 60 cm.

Not long after, he was immediately contacting the East Jakarta Fire and Rescue (Gulkarmat) Sub-agency to evacuate locals using two rubber boats.

"Evacuations sites are now set up at Al Muqorobin Mosque, RW 03 and in the front of RW 04 Post. But they will be moved to the Borobudur University Hall," he expressed.

According to him, since 6 PM to 7:45 PM, people kept coming to the evacuation site. Based on temporary data, 50 took refuge in the Al Muqorobin Mosque and 100 other evacuated to a police tent in the front of RW 04 Post. 

"The refugees will continue to rise tonight. That's why we will move tents to the Borobudur University Hall," he furthered.

Aside that, he had coordinated with the campus. Currently a fleet is being prepared to transport refugees to the campus, including blankets, mats, carpets for refugee mats.

He had also coordinated with the East Jakarta Social Sub-agency to supply 200 meal boxes and mineral drinks for dinner. As for the medicine has been prepared by the urban village puskemas.

To evacuate the refugees, as many as 50 joint personnel were still on standby as of tonight. They were assigned with monitoring water levels, evacuation teams, guarding the urban village office for preparing logistic, etc. Most came from elements of the urban village ASN, Satpol PP and PPSU.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye428 personFakhrizal Fakhri
  3. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye406 personTiyo Surya Sakti
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
KONTAK KAMI

Jl. Medan Merdeka Selatan 8-9 Blok F Lt. II Jakarta
local_phone +62 21 3822356
email redaksi@beritajakarta.id

TAUTAN LAINNYA
Tentang Kami | Sitemap | Infografis

© copyright 2001 - 2026 All Rights Reserved

close