You don't have javascript enabled. Good luck with that.
Pencarian
Antisipasi Banjir Januari, Jaktim Siapkan 42 Pompa Air

42 Water Pumps in East Jakarta Put on Standby

To anticipate flood peak which predicted to happen in January 2015, East Jakarta Administration is putting on standby 42 water pumps. But from those 42 pumps, two of them are malfunctioned because they are already 10 years old. These pumps will be repaired.

All pumps are ready to anticipate the flood peak which predicted to happen in January 2015

Head of East Jakarta Water Management Sub-Department, Henry Dunant, said the 42 water pumps consist of 22 pumps installed in 8 pump houses and 17 mobile pumps. The capacity of each pump to suck the water is varied, ranging from 75 liters per second to 1,000 liters per second.

“All pumps are ready to anticipate the flood peak which predicted to happen in January 2015,” he stated, Monday (12/1).

City Gears Up to Anticipate Flooding in 62 Areas

According to Dunant, the constraints which often faced by his party in flood anticipation are the piles of trashes in the drains that eventually clogging water flows in sluices and water pumps. As a result, water could overflow onto the road in a matter of seconds, as happened on Jalan DI Panjaitan.

“Thus, we had to clean up the trashes so the pumps would work optimally,” he told.

Linked News
Popular News indeks
  1. Fire at Pondok Bambu Allegedly Triggered by Electrical Short

    access_time19-05-2026 remove_red_eye1366 personNurito
  2. Governor Pramono Named Vice Chair of C40 Cities Steering Committee

    access_time18-05-2026 remove_red_eye992 personAldi Geri Lumban Tobing
  3. Inundation on DI Panjaitan Road Recede

    access_time20-05-2026 remove_red_eye829 personNurito
  4. Dharma Jaya Ready for Thousands of Eid al-Adha Sacrifices

    access_time20-05-2026 remove_red_eye632 personAldi Geri Lumban Tobing
  5. Rasuna Said Car-Free Day to Return in June 2026

    access_time16-05-2026 remove_red_eye603 personAldi Geri Lumban Tobing