You don't have javascript enabled. Good luck with that.
Pencarian
Antisipasi Banjir Januari, Jaktim Siapkan 42 Pompa Air
Kasudin PU Tata Air Jakarta Timur, Henry Dunant mengatakan dari 42 pompa itu, 22 pompa di antaranya terdapat di 8 rumah pompa yang ada di Jakarta Timur.  Selain itu terdapat 9 pompa mobile yang sifatnya terpasang di rumah pompa dan 4 pompa mobi.
photo istimewa - Beritajakarta.id

42 Water Pumps in East Jakarta Put on Standby

To anticipate flood peak which predicted to happen in January 2015, East Jakarta Administration is putting on standby 42 water pumps. But from those 42 pumps, two of them are malfunctioned because they are already 10 years old. These pumps will be repaired.

All pumps are ready to anticipate the flood peak which predicted to happen in January 2015

Head of East Jakarta Water Management Sub-Department, Henry Dunant, said the 42 water pumps consist of 22 pumps installed in 8 pump houses and 17 mobile pumps. The capacity of each pump to suck the water is varied, ranging from 75 liters per second to 1,000 liters per second.

“All pumps are ready to anticipate the flood peak which predicted to happen in January 2015,” he stated, Monday (12/1).

City Gears Up to Anticipate Flooding in 62 Areas

According to Dunant, the constraints which often faced by his party in flood anticipation are the piles of trashes in the drains that eventually clogging water flows in sluices and water pumps. As a result, water could overflow onto the road in a matter of seconds, as happened on Jalan DI Panjaitan.

“Thus, we had to clean up the trashes so the pumps would work optimally,” he told.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye393 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye389 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye347 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye322 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye314 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik