You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Kolam Olakan di Jalan RE Martadinata Rampung

Stilling Basin Construction on Jalan R.E. Martadinata Has Been Completed

North Jakarta Water Resources (SDA) Sub-agency had completed stilling basin construction on Jalan R.E. Martadinata, Ancol Urban Village, Pademangan Sub-district.

We are targeting the stilling basin to overcome inundation that often occurs

Pademangan Water Resources Task Force Head, Slamet Riyanto conveyed, his side built it with size 3x4 meters and depth 1.5 meters.

"The construction has been carried out since November 25, 2021 and finished yesterday," he mentioned, Friday (12/10).

Stilling Basin is Built in RPTRA Amiterdam Area

According to him, stilling basin was built to overcome rainwater or overflowing water from tributary of Ciliwung River on Jalan Gunung Sahari.

"We are targeting the stilling basin to overcome inundation that often occurs around intersection between Jalan R.E. Martadinata and Jalan Gunung Sahari in front of Bintang Pospol, Ancol," he explained.

Linked News
Popular News indeks
  1. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye781 personAldi Geri Lumban Tobing
  2. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye764 personBudhi Firmansyah Surapati
  3. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye717 personAldi Geri Lumban Tobing
  4. Pramono Pushes for Partnership Between New Toto Tentrem and Tarakan Hospitals

    access_time24-08-2026 remove_red_eye675 personDessy Suciati
  5. Transjakarta Commits to Transport Equality Across the Seribu Islands

    access_time24-08-2026 remove_red_eye647 personAldi Geri Lumban Tobing