You don't have javascript enabled. Good luck with that.
Pencarian
Delapan Satgas Pertamanan Lakukan Perbaikan Lanjutan Turap di TPU Rambutan
....
photo Nurito - Beritajakarta.id

Retaining Walls Repair Work at TPU Rambutan 1 Continued

As many as 8 personnel of East Jakarta City Park and Forestry Sub-agency Task Force continued repairing the collapsed retaining wall at Rambutan 1 Public Cemetery (TPU), Rambutan Urban Village, Ciracas.

Now we continue to repair the other retaining wall located inside TPU with length of 10 meters

East Jakarta City Park and Forestry Sub-agency's Green Belt and Cemetery Section Head, Atang Setiawan said, last week his side had completed repair work on 4-meter high retaining wall along 25-meter long channel at the same location. Now he continued to repair retaining wall on the inside of TPU which was about 10 meters long and 3 meters high.  

"Repair on the front side along 25 meters had been completed last week. Now we continue to repair the other retaining wall located inside TPU with length of 10 meters," he informed, Monday (12/13).

Collapsed Retaining Wall on Jl. Jeruk Raya Repaired

According to him, his side used river stone to repair the 10-meter retaining wall. Every 3 meters, cast concrete sloop will be installed at the top and bottom of retaining wall to make it sturdy and durable.

"This repair is targeted to be completed in this week," he closed.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye536 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye430 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye307 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye298 personAldi Geri Lumban Tobing
  5. Jakarta Commits to Realizing National Waste Management Pilot Project

    access_time17-02-2025 remove_red_eye293 personFolmer