You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Saluran di Jalan Kelinci Dua Capai 55 Persen

118-meter Channel Being Built alongside Jalan Gang Kelinci II

The 118-meter-long water channel is being built on Jalan Gang Kelinci II, RT 13/04, Pasar Baru Urban Village, Sawah Besar, Central Jakarta.

Hopefully, it is capable of minimizing flooding in the area when it rains

Maintenance Division Head, Achmad Daeroby expressed, the channel is made to replace the damaged ones in draining water into Ciliwung River's connecting channel (phb).

Next Week, Connecting Channel Development on Jalan I Gusti Ngurah Rai Completed

"Thus far, the progress has touched 65 meters from a total length of 118 meters with 70 centimeters depth and 60 centimeters width. The previous channel was only 40 centimeters depth and 40 centimeters width," he expressed, Monday (1/10).

He said, it has been ongoing since early December 2021 and is targeted to be completed by the end of January.

"To execute it, we have 20 personnel plus one excavator at the site," he said.

RT 123/04 Pasar Baru Urban Village Chairman, Loapiabun (60), appreciated the agency's quick response in following up on residents' requests regarding the construction of channels.

"The work on site is also pretty neat. Hopefully, it is capable of minimizing flooding in the area when it rains," he said.

Linked News
Popular News indeks
  1. Open for All: Jakarta City Hall Welcomes Visitors for Namu Balai Kota

    access_time03-10-2026 remove_red_eye731 personDessy Suciati
  2. Transjakarta Reaffirms Ban on Busking in Mikrotrans and Bus Stops

    access_time02-10-2026 remove_red_eye538 personAldi Geri Lumban Tobing
  3. Jakarta Builds Five New Animal Health Centers to Expand Veterinary Services

    access_time30-09-2026 remove_red_eye531 personAldi Geri Lumban Tobing
  4. 1,500 Runners and Pets Hit the Track for World Rabies Day Run 2026

    access_time03-10-2026 remove_red_eye528 personAnita Karyati
  5. Commission D Supports Reserve Fund for Long-Term Infrastructure

    access_time02-10-2026 remove_red_eye511 personFakhrizal Fakhri