You don't have javascript enabled. Good luck with that.
Pencarian
800 Meter Kubik Sampah Di Pintu Manggarai Diangkut

800 Cubic Meters of Waste Transported from Manggarai Sluice Gate

As many as 800 cubic meters of waste had been transported from the Manggarai Sluice Gate, Jalan Tambak, Menteng, Central Jakarta, on Thursday (2/17). The waste was washed away during heavy rains that flushed the Greater Jakarta area last night.

We use 15 trucks and three heavy equipment to transport waste from the river

Central Jakarta Water Agency UPK Executing Unit Head, Farry Andhiko expressed, at 2 AM, the water level at the sluice gate touched 745 cm or at alert level 3, causing a pile of waste.

"After Katulampa Sluice Gate in Bogor at alert level 3 with a water level of 100 cm and Depok at alert level 3 with a water level of 200 cm yesterday afternoon, we are ready to anticipate shipments of waste that arrives at 2 AM," he explained.

PPKM Level 3 Extended, Governor Anies Reminds Residents to Stay Alert

He furthered the current volume of waste entering the Manggarai Sluice Gate has increased sharply and is being cleaned. Until 11.30 AM, around 800 cubic meters had been transported.

The waste transported was dominated by tree cuttings, bamboo, mattresses, and household waste materials. They would be taken to the Bantargebang landfill.

"We use 15 trucks and three heavy equipment to transport waste from the river," he closed.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye948 personAldi Geri Lumban Tobing
  2. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye669 personAldi Geri Lumban Tobing
  3. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye547 personAldi Geri Lumban Tobing
  4. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye546 personAldi Geri Lumban Tobing
  5. Drainage Normalization on Jalan Mandioli to Be Completed in October

    access_time28-08-2026 remove_red_eye492 personFolmer