You don't have javascript enabled. Good luck with that.
Pencarian
Jalan Rusak di Pulogebang Mulai Diaspal Kembali

Damaged Roads in Pulogebang Being Repaired

Six workers of the East Jakarta Bina Marga Sub-agency have started repairing damaged roads along Jalan Mutiara Raya, which is an access road towards Pulogebang Rusunawa, Cakung, East Jakarta, on Sunday (2/20).

Due to rainy season, it is carried out gradually and is targeted to be complete next week

Road and Bridge Division Head, Budi Cahyo said those roads were damaged due to heavy rain and the passing truck.

"Due to rainy season, it is carried out gradually and is targeted to be complete next week," he said.

Channel's Collapsed Sheet Pile on Jalan Pluit Raya Being Repaired

Thus far, the workers had repaired roads measuring 7.5x4 meters and 7.5x4.5 meters.

Zaelani, (45), a resident of RW 11 Pulogebang admitted that the condition of the damaged road was very disturbing the comfort of the residents.

"Hopefully, the repair can be finished quickly," she hoped.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye875 personAldi Geri Lumban Tobing
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye800 personAldi Geri Lumban Tobing
  3. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye774 personBudhi Firmansyah Surapati
  4. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye627 personAldi Geri Lumban Tobing
  5. Drainage Normalization on Jalan Mandioli to Be Completed in October

    access_time28-08-2026 remove_red_eye468 personFolmer