You don't have javascript enabled. Good luck with that.
Pencarian
Pembuatan Crossing Saluran di Kampung Nelayan Rampung 2 Pekan
....
photo Budhi Firmansyah Surapati - Beritajakarta.id

Crossing Channel Built in Kampung Nelayan Kamal Muara

The North Jakarta Water Resources (SDA) Sub-agency has built a crossing channel in Kampung Nelayan RT 02/04, Kamal Muara Urban Village, Penjaringan Sub-district.

The work is targeted to be completed in two weeks

Its channel was built to connect the channels from a residential area to the main channel that led to Kamal Muara Pump to overcome inundation during heavy rains.

Penjaringan Sub-district SDA Unit Head, Pendi conveyed, during heavy rains, the residential area was often inundated because the channel was not connected to the main channel. Residents had asked his side to deal with inundation in the area through Musrenbang 2021.

Four Sheet Piles Repair in Cipinang Elok will Be Completed Next Week

"Since Wednesday (3/2), we have been starting the construction work by deploying 6 personnel," he mentioned, Friday (3/4).

His side planned to build a crossing channel with a length of 230 centimeters, width of 50 centimeters, and height of 50 centimeters.

"The work is targeted to be completed in two weeks," he said.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1505 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye926 personAldi Geri Lumban Tobing
  3. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye392 personFolmer
  4. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye392 personDessy Suciati
  5. 13 Inter-village Bridges in South Jakarta Revitalized

    access_time16-01-2025 remove_red_eye367 personTiyo Surya Sakti