You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Kali Grogol Segmen Susilo Capai 99 Persen

Grogol River Dredging on Susilo Segment Touches 99 Percent

The West Jakarta Water Resources (SDA) Sub-agency continues to accelerate dredging work on the Segment II Susilo of Grogol River, Jalan Latumenten, Grogol, Grogol Petamburan.

It is carried out to increase the river's capacity

The progress of river dredging work which began on February 20, 2020, has now reached 99 percent.

West Jakarta SDA Sub-agency Head, Purwanti stated, her side used heavy equipment to dredge mud on Grogol River with a depth of 2 meters.

Jakarta Doesn't Appeal to Administrative Court Decision Regarding Flood Handling

"It is carried out to increase the river's capacity," she mentioned, Friday (3/11).

As a result, her side could transport mud to 10 dump trucks a day. Later on, dredging on the river would be continued to the Borobudur Pump area.

"Hopefully, the Grogol area will be free from inundation after the dredging," she conveyed.

Linked News
Popular News indeks
  1. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye975 personAldi Geri Lumban Tobing
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye935 personAldi Geri Lumban Tobing
  3. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye842 personFakhrizal Fakhri
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye711 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye609 personAnita Karyati