You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jakbar Kuras Kolakan Rumah Pompa Jelambar

Retention Pond at Jelambar Pump House Dredged

The West Jakarta Water Resources (SDA) Sub-agency has deployed 10 workers to dredge a retention pond as wide as 32 square meters with four meters high, locally known as kolam olakan at the Jelambar Pump House, Jalan Jelambar Selatan II, Jelambar Baru, Grogol Petamburan.

It is done because the pond is full of waste and mud

Jelambar Pump House Operator Ricky Parman said the dredging was carried out by picking up waste and mud as deep as 40 centimeters.

'It is done because the pond is full of waste and mud," he expressed, Wednesday (3/20).

Mid-March, Retention Pond Construction on Jalan Pegangsaan Dua Completed

He explained the pond serves to collect water from the connecting channel which is then pumped and discharged into the Grogol River when the pond is full. The pump house itself has three pumps with 500-1,000 liters per second capacity.

"This work has been ongoing for three days and is targeted to be completed within a week," he stated.

Linked News
Popular News indeks
  1. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye780 personAldi Geri Lumban Tobing
  2. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye763 personBudhi Firmansyah Surapati
  3. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye703 personAldi Geri Lumban Tobing
  4. Pramono Pushes for Partnership Between New Toto Tentrem and Tarakan Hospitals

    access_time24-08-2026 remove_red_eye675 personDessy Suciati
  5. Transjakarta Commits to Transport Equality Across the Seribu Islands

    access_time24-08-2026 remove_red_eye647 personAldi Geri Lumban Tobing