You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Kolam Olakan di RPTRA Amiterdam Pulau Untung Jawa Rampung

Retention Ponds Construction in Amiterdam RPTRA Completed

The Thousand Islands Water Resources (SDA) Sub-agency has completed the construction of retention ponds locally known as kolam olakan in Amiterdam RPTRA area, RT 02/03, Untung Jawa Island Urban Village, South Thousand Islands Sub-district.

These ponds will also help officers to do water suction

Thousand Islands SDA Sub-agency Head, Hendri said, the ponds were made in the size of 2.5 meters with 2 meters and 50 centimeters. They also completed with three drainage controls measuring 60 centimeters length with 90 centimeters width and 50 centimeters depth.

"Alhamdulillah, our job is done. The ponds have three drainage controls plus covers. They are painted with yellow and blue colors for a neater look," he expressed, Monday (11/29).

Three Retention Ponds Built in Block N Park Cipayung

According to him, it aimed to overcome tidal waves in RT 02/03, around Amiterdam RPTRA and futsal field, as well as to increase the capacity of the existing drainage controls and infiltration wells.

"These ponds will also help officers to do water suction," he stated.

Linked News
Popular News indeks
  1. Suckermouth Catfish Control for Environmental Preservation

    access_time18-04-2026 remove_red_eye784 personFakhrizal Fakhri
  2. Jakarta Regional Budget Spending Reaches Rp10.38 Trillion in Q1

    access_time17-04-2026 remove_red_eye713 personDessy Suciati
  3. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye622 personTiyo Surya Sakti
  4. Job Absorption Rises in Jakarta

    access_time17-04-2026 remove_red_eye615 personDessy Suciati
  5. Training and Certification Boost Tourism Workforce Competitiveness

    access_time17-04-2026 remove_red_eye597 personAldi Geri Lumban Tobing