You don't have javascript enabled. Good luck with that.
Pencarian
Awal 2015, Dinas PU Bangun 2 Flyover
Please select photo... Guna mengurai kemacetan di ibu kota, sebanyak dua flyover akan dibangun tahun depan. Dengan demikian diharapkan kepadatan lalu lintas di persimpa.
photo istimewa - Beritajakarta.id

Flyovers to Be Built above Permata Hijau and Kuningan Railway Crossings

Jakarta Provincial Government is about to build two flyovers above Permata Hijau and Kuningan railway crossings. This project is to parse traffic congestion in Jakarta.

The (physical) construction is predicted started early next year, so the flyovers could be operated by December 2015

“The auction process of this project has finished and the auction winners are currently making the flyovers’ designs. The (physical) construction is predicted started early next year, so the flyovers could be operated by December 2015,” stated Head of Jakarta Public Works Department, Agus Priyono, Friday (12/19).

According to Priyono, flyover construction above Permata Hijau railway crossing is in line with the additional of commuter line train trips. The flyover itself will pass through commuter line train routes of Tanah Abang-Serpong-Parung Panjang and Jakarta-Merak train.

TransJakarta Corridor XIII Flyover Physical Construction Starts April 2015

“High volume of passing trains is directly proportional with vehicle volume. So, when a train passed and the railway crossing closed, vehicles’ queue becomes long,” he uttered.

Permata Hijau Flyover will have a length of 544 meters with width 10 meters. Its construction is carried out by PT Lampiri Djaya Abadi, PT Multi Structure, and PT Brantas Abispraya.

As for the Kuningan Flyover, it will stretch above Kuningan intersection on Jalan Gatot Subroto, precisely from Pancoran towards Semanggi. It is built to minimize the density of vehicles from Semanggi and Jalan Rasuna Said towards Mampang Prapatan and vice versa. The flyover will have a length of 680 meters with width 5.1 meters. Its construction is done by PT Nindya Karya.

Unfortunately, Priyono did not mention the budget spent to build these flyovers.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye954 personTP Moan Simanjuntak
  2. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye660 personBudhi Firmansyah Surapati
  3. Satpol PP Expels Illegal Participants at Sudirman - Thamrin CFD

    access_time27-10-2024 remove_red_eye454 personBudhi Firmansyah Surapati
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye395 personTiyo Surya Sakti
  5. Traffic Arrangement Applied on Jalan Tambak

    access_time28-10-2024 remove_red_eye370 personAldi Geri Lumban Tobing