You don't have javascript enabled. Good luck with that.
Pencarian
Skema Pembiayaan Pembangunan MRT Fase III dan IV Dirancang Libatkan Swasta
....
photo Budhi Firmansyah Surapati - Beritajakarta.id

Financing Scheme for MRT Phase 3 and 4 Construction Involves Private Sector

PT. MRT Jakarta (Perseroda) and the private sector have designed Phase 3 (East-West Line) and Phase 4. Of the total value, the private sector is targeted to absorb 40 percent of total financing.

Therefore, the East-West line and Phase 4 are sought from private funding of 40 percent

PT. MRT Jakarta President Director William P. Sabandar mentioned that in the initial phase, namely Phase 1 and 2, the entire development relied on financial support from the government. So far, JICA as the government's partner had committed to completing Phase 1 and 2 financings.

"We have a case study from England's Elizabeth Line where there is the involvement of the private sector. Therefore, the East-West line and Phase 4 are sought from private funding of 40 percent," he stated, Thursday (6/30).

Japan Commits to Boost Construction of Phase 2 MRT Jakarta

He explained that during a visit to England some time ago, his side also visited Crossrail International, which manages the Elizabeth Line in England. Elizabeth Line is a commuter line connecting the east and west of London.

He conveyed that the line construction was not all financed by the state. For example, the construction of stations and depots on the Elizabeth Line involves the private sector with the potential benefits offered.

The construction of Phase 3 (East-West Line) has a length of about 87 kilometers from Balaraja to Cikarang. He estimated that the construction budget to reach Rp 160 trillion.

Meanwhile, Phase 4 (Fatmawati-TMII) has a length of about 12 kilometers with an estimated budget of around Rp 22-30 trillion.

"In addition to England, we also visited France, Luxemburg, and South Korea, outside of Japan. The response has been very good," he said. the overall value, private sector is targeted to absorb up to 40 percent of total financing.

PT. MRT Jakarta President Director William P. Sabandar mentioned that in the initial phase, namely Phase 1 and 2, the entire development relied on financial support from the government. So far, JICA as the government's partner had committed to completing Phase 1 and 2 financings.

"We have a case study from England's Elizabeth Line where there is the involvement of the private sector. Therefore, the East-West line and Phase 4 are sought from private funding of 40 percent," he stated, Thursday (6/30).

He explained that during a visit to England some time ago, his side also visited Crossrail International, which manages the Elizabeth Line in England. Elizabeth Line is a commuter line connecting the east and west of London.

He conveyed that the line construction was not all financed by the state. For example, the construction of stations and depots on the Elizabeth Line involves the private sector with the potential benefits offered.

The construction of Phase 3 (East-West Line), he added, has a length of about 87 kilometers from Balaraja to Cikarang. He estimated that the construction budget to reach Rp 160 trillion.

Meanwhile, Phase 4 (Fatmawati-TMII) has a length of about 12 kilometers with an estimated budget of around Rp 22-30 trillion.

"In addition to England, we also visited France, Luxemburg, and South Korea, outside of Japan. The response has been very good," he said.

Linked News
Popular News indeks
  1. UK Royal Marine Band Enlivens Jakarta Anniversary

    access_time27-06-2025 remove_red_eye359 personDessy Suciati
  2. 19,675 People Visit Ragunan Zoo on Islamic New Year

    access_time27-06-2025 remove_red_eye355 personTiyo Surya Sakti
  3. No Car Free Day on June 29 to Support Jakarta International Marathon 2025

    access_time24-06-2025 remove_red_eye348 personAldi Geri Lumban Tobing
  4. Transjakarta Wins Award for Best GCG Company

    access_time27-06-2025 remove_red_eye328 personAldi Geri Lumban Tobing
  5. Most Residents Satisfied with Pramono-Rano's Performance

    access_time25-06-2025 remove_red_eye324 personDessy Suciati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik