You don't have javascript enabled. Good luck with that.
Pencarian
Antisipasi Genangan, Pemkot Jaktim Akan Bangun 2.000 Sumur Resapan

East Jakarta Gears Up to Build 2,000 Infiltration Wells

The East Jakarta administration is about to build around 2,000 infiltration wells in ten sub-districts in order to anticipate inundation and flooding in the rainy season.

Hopefully, all the wells can be realized without a hitch

It was discussed and realized in the regional coordination meeting (Rakorwil) held at Block C Building, East Jakarta Mayor's office on Thursday (8/18).

According to Muhammad Anwar, Mayor of East Jakarta, the location point for the infiltration well will be mapped next week, especially in areas that often occur inundation and flooding during the rainy season.

72 Infiltration Wells Built in Cipayung

Therefore, he wanted the Water Resources Sub-agency to schedule a survey of locations that prone to inundation and flooding.

They were also instructed to check the condition of all reservoirs, embung (artificial lake), and water channels in 10 sub-districts.

"It would be better to do it now considering it's the dry season right now. Hopefully, all the wells can be realized without a hitch," he concluded.

Linked News
Popular News indeks
  1. Jakarta Unites for a Massive 'Clean Sweep' Across All Districts

    access_time07-02-2026 remove_red_eye1764 personBudhi Firmansyah Surapati
  2. Jakarta's Planning must Be Functional and Environmentally Friendly

    access_time06-02-2026 remove_red_eye1098 personFakhrizal Fakhri
  3. Rano Tees Off the 8th INFOBANK Green Golf Tournament

    access_time07-02-2026 remove_red_eye750 personBudhi Firmansyah Surapati
  4. Jakarta Coastal Areas on Alert for Possible Tidal Flood

    access_time11-02-2026 remove_red_eye747 personAldi Geri Lumban Tobing
  5. Monorail Pole Demolition must Be Accelerated, Pramono Says

    access_time06-02-2026 remove_red_eye605 personDessy Suciati