You don't have javascript enabled. Good luck with that.
Pencarian
Antisipasi Genangan, Pemkot Jaktim Akan Bangun 2.000 Sumur Resapan
....
photo istimewa - Beritajakarta.id

East Jakarta Gears Up to Build 2,000 Infiltration Wells

The East Jakarta administration is about to build around 2,000 infiltration wells in ten sub-districts in order to anticipate inundation and flooding in the rainy season.

Hopefully, all the wells can be realized without a hitch

It was discussed and realized in the regional coordination meeting (Rakorwil) held at Block C Building, East Jakarta Mayor's office on Thursday (8/18).

According to Muhammad Anwar, Mayor of East Jakarta, the location point for the infiltration well will be mapped next week, especially in areas that often occur inundation and flooding during the rainy season.

72 Infiltration Wells Built in Cipayung

Therefore, he wanted the Water Resources Sub-agency to schedule a survey of locations that prone to inundation and flooding.

They were also instructed to check the condition of all reservoirs, embung (artificial lake), and water channels in 10 sub-districts.

"It would be better to do it now considering it's the dry season right now. Hopefully, all the wells can be realized without a hitch," he concluded.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1503 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye924 personAldi Geri Lumban Tobing
  3. Residents Flock to Cheap Bazaar at Cilandak Timur Urban Village Office

    access_time15-01-2025 remove_red_eye771 personTiyo Surya Sakti
  4. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye388 personFolmer
  5. 13 Inter-village Bridges in South Jakarta Revitalized

    access_time16-01-2025 remove_red_eye367 personTiyo Surya Sakti