You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Embung Penganten Ali Capai Lima Persen

Construction of Penganten Ali Embung in Ciracas Keeps Being Accelerated

Embung is dredged up to four meters deep using three heavy equipment

The Penganten Ali Embung (artificial lake) construction in Ciracas Urban Village, East Jakarta keeps being accelerated. Its construction has been carried out since early August and is targeted for completion by the end of this year.

Thus far, the work progress is only about five percent.

East Jakarta to Build Embung in Cibubur to Anticipate Flooding

Maintenance Division Head Puryanto expressed that the embung, which is built on a 9,300-square-meter land was to cope with the overflow of the Cipinang River which usually inundates RW 06, Ciracas Urban Village.

"Embung is dredged up to four meters deep using three heavy equipment, consisting of two long-arm excavators and one standard excavator," he explained, Monday (9/5).

If it was done, the surrounding area would be used as a vehicle for ecotourism with a 5-meter-wide jogging track facility

"People will feel safe and comfortable when exercising while traveling in these locations," he explained.

 East Jakarta Mayor, Muhammad Anwar hoped that the Penganten Ali Embung could accommodate approximately 75,000 cubic meters of water, which is a flood controller in RW 06 Ciracas area.

"It is also designed as a tourist destination. That's why we prepare a jogging track at the location, including an interactive park and an outdoor theater," he concluded.

Linked News
Popular News indeks
  1. Pramono Flags Off 10,000 Runners at Soekarno Run 2026

    access_time15-02-2026 remove_red_eye1045 personFolmer
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye932 personAldi Geri Lumban Tobing
  3. Jakarta Unveils Indonesia’s First SDGs Corner at Maritime Museum

    access_time15-02-2026 remove_red_eye927 personNurito
  4. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye879 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye696 personAldi Geri Lumban Tobing