You don't have javascript enabled. Good luck with that.
Pencarian
Katulampa Siaga III, Warga Diminta Waspada
.
photo istimewa - Beritajakarta.id

Jakarta on Alert as Water Level Rises in Katulampa

At 3 PM, the water level has reached 100 centimeters or alert III status

The Katulampa Sluice Gate's water level has reached on alarming 100 centimeters or alert III status, following heavy rain in Bogor since yesterday. The data was recorded at around 3 PM, Thursday (2/12).

Officer of the Emergency Operation Command Center (Pusdalops) for Jakarta Regional Disaster Mitigation Agency (BPBD), Suratman disclosed,at 12 PM, the water level was still normal or showing on alert III status. But it continues to rise gradually.

Katulampa in Alert 3, Citizens Urged to Be Wary of Floods

"At 3 PM, the water level has reached 100 centimeters or alert III status," he told, Thursday (2/12).

He assessed, the condition will have an impact on another sluice, Depok. Flood is predicted to hit Jakarta and its surrounding area about nine hours ahead. "Perhaps, the water comes at 12 AM," he predicted.

Some urban villages that will be inundated are Cawang, Bukit Duri, Kampung Melayu, and Bidara Cina. The early warning had been announced to the citizens in such residential.

Meanwhile, as many as 11 other sluice gates are still on alert IV status with varying water levels. They are Depok (115 cm), Manggarai (650 cm), Karet (390 cm), Krukut Hulu (80 cm), Pesanggrahan (80 cm), Angke Hulu (120 cm), Cipinang Hulu (90 cm), Sunter Hulu (50 cm), Pulo Gadung (370 cm), Pluit Dam (-125 cm), and Pasar Ikan (155 cm).

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye414 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye396 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye352 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye324 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye316 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik