You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Lingkungan Jalan Petamburan IV Dikuras

Sodetan Construction on Panggang Island Completed

The Seribu Island Water Resources (SDA) Sub-agency has completed the sodetan (crossing channel) contruction in residential area, RT 07/02 Panggang Island, North Seribu Islands.

It is done to follow up on locals' requests and has been completed

Seribu Islands SDA Sub-agency Head, Hendri said the sodetan as long as 10.5 meters was planned to be buult with a drainage control box in the size of 50x40x20 centimeters.

"The location includes a basin area, which is prone to puddles when it rains. So, we made a sodetan using a pipe channeled into the sea," he said, Monday (7/17).

Heru: Ciliwung River Sodetan to Reduce Flood Risk in Jakarta

According to him, the work has been ongoing since Thursday (7/13) by sending 10 personnel to the location.

"It is done to follow up on locals' requests and has been completed. It aims to prevent inundation," he added.

Panggang Island Island Urban Village Head, Muhammad Fakih Burhanudin confirmed that the surrounding area was often inundated if the rain intensity was high. Because of that, the construction was urgently needed.

"Thank God, we managed to complete residents' requests one by one," he said.

Linked News
Popular News indeks
  1. Pramono Affirms Commitment to Enhancing Regional Financial Management Quality

    access_time02-04-2026 remove_red_eye793 personTiyo Surya Sakti
  2. Pramono Calls for Enhanced Synergy at DPRD Post-Eid Gathering

    access_time30-03-2026 remove_red_eye702 personDessy Suciati
  3. Banners Prohibiting Illegal Parking Levies Installed at Blok M Square

    access_time02-04-2026 remove_red_eye639 personTiyo Surya Sakti
  4. Kampung Rambutan Terminal Sees Increase in Intercity Bus Passengers

    access_time03-04-2026 remove_red_eye576 personNurito
  5. Gov Pramono: Jakarta Prepared to Adopt Weekly WFH Scheme

    access_time30-03-2026 remove_red_eye447 personDessy Suciati