You don't have javascript enabled. Good luck with that.
Pencarian
Pengerjaan Turap, Kali Apuran, Cengtim, Tuntas
....
photo TP Moan Simanjuntak - Beritajakarta.id

Sheet Pile Construction in Cengkareng Timur Completed

The West Jakarta Water Resources (SDA) Sub-agency has completed the sheet piles construction on both sides of the Apuran River, in RW 03 and 05, Cengkareng Timur Urban Village, Cengkareng Sub-district.

Hopefully, it is able to minimize inundation caused by overflowing waters of Apuran River

West Jakarta SDA Sub-agency Head, Purwanti said the sheet pile construction was focused on both sides for 1.2 kilometers or starting from Jalan Nurul Amal in RW 05 to the bridge in RW 03.

"This construction was finally completed," she expressed, Monday (7/24).

Collapsed Sheet Pile on Jalan Hang Jebat 3 Repaired

She explained it had been started since August 2022 where the sheet pile has 800 meters long and 400 meters high.

"Hopefully, it is able to minimize inundation caused by overflowing waters of Apuran River," she said.

Kurniati (54), a resident of RW 03, Cengkareng Timur Urban Village positively welcomed and appreciated it.

"We're grateful, as the construction near my village has been completed," he stated.

Linked News
Popular News indeks
  1. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye793 personBudhi Firmansyah Surapati
  2. W. Jakarta SDA Constructs Channel on Jalan Nurul Muslimin I Kembangan

    access_time04-11-2024 remove_red_eye773 personTP Moan Simanjuntak
  3. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye474 personFolmer
  4. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye373 personBudhi Firmansyah Surapati
  5. Semongol River Dredging Intensified

    access_time06-11-2024 remove_red_eye329 personTP Moan Simanjuntak