You don't have javascript enabled. Good luck with that.
Pencarian
Pengerjaan Turap, Kali Apuran, Cengtim, Tuntas

Sheet Pile Construction in Cengkareng Timur Completed

The West Jakarta Water Resources (SDA) Sub-agency has completed the sheet piles construction on both sides of the Apuran River, in RW 03 and 05, Cengkareng Timur Urban Village, Cengkareng Sub-district.

Hopefully, it is able to minimize inundation caused by overflowing waters of Apuran River

West Jakarta SDA Sub-agency Head, Purwanti said the sheet pile construction was focused on both sides for 1.2 kilometers or starting from Jalan Nurul Amal in RW 05 to the bridge in RW 03.

"This construction was finally completed," she expressed, Monday (7/24).

Collapsed Sheet Pile on Jalan Hang Jebat 3 Repaired

She explained it had been started since August 2022 where the sheet pile has 800 meters long and 400 meters high.

"Hopefully, it is able to minimize inundation caused by overflowing waters of Apuran River," she said.

Kurniati (54), a resident of RW 03, Cengkareng Timur Urban Village positively welcomed and appreciated it.

"We're grateful, as the construction near my village has been completed," he stated.

Linked News
Popular News indeks
  1. MRT Jakarta Integrates Ticket Payments with JakLingko from October 12

    access_time10-10-2026 remove_red_eye554 personAldi Geri Lumban Tobing
  2. Jakarta Administration Steps Up Proactive Fire Prevention Efforts

    access_time09-10-2026 remove_red_eye547 personDessy Suciati
  3. New Kelapa Gading-Pulogadung Road to Ease Traffic and Improve Access

    access_time10-10-2026 remove_red_eye534 personAldi Geri Lumban Tobing
  4. Kramat Pulo Fire Survivors Get Help Replacing School Documents

    access_time09-10-2026 remove_red_eye522 personFolmer
  5. Basic Supplies Distributed to Pinang Ranti Fire Survivors

    access_time09-10-2026 remove_red_eye510 personNurito