You don't have javascript enabled. Good luck with that.
Pencarian
Pengerjaan Turap, Kali Apuran, Cengtim, Tuntas
....
photo TP Moan Simanjuntak - Beritajakarta.id

Sheet Pile Construction in Cengkareng Timur Completed

The West Jakarta Water Resources (SDA) Sub-agency has completed the sheet piles construction on both sides of the Apuran River, in RW 03 and 05, Cengkareng Timur Urban Village, Cengkareng Sub-district.

Hopefully, it is able to minimize inundation caused by overflowing waters of Apuran River

West Jakarta SDA Sub-agency Head, Purwanti said the sheet pile construction was focused on both sides for 1.2 kilometers or starting from Jalan Nurul Amal in RW 05 to the bridge in RW 03.

"This construction was finally completed," she expressed, Monday (7/24).

Collapsed Sheet Pile on Jalan Hang Jebat 3 Repaired

She explained it had been started since August 2022 where the sheet pile has 800 meters long and 400 meters high.

"Hopefully, it is able to minimize inundation caused by overflowing waters of Apuran River," she said.

Kurniati (54), a resident of RW 03, Cengkareng Timur Urban Village positively welcomed and appreciated it.

"We're grateful, as the construction near my village has been completed," he stated.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye520 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye421 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye306 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye291 personAldi Geri Lumban Tobing
  5. Jakarta Commits to Realizing National Waste Management Pilot Project

    access_time17-02-2025 remove_red_eye289 personFolmer