You don't have javascript enabled. Good luck with that.
Pencarian
Pengerjaan Turap, Kali Apuran, Cengtim, Tuntas

Sheet Pile Construction in Cengkareng Timur Completed

The West Jakarta Water Resources (SDA) Sub-agency has completed the sheet piles construction on both sides of the Apuran River, in RW 03 and 05, Cengkareng Timur Urban Village, Cengkareng Sub-district.

Hopefully, it is able to minimize inundation caused by overflowing waters of Apuran River

West Jakarta SDA Sub-agency Head, Purwanti said the sheet pile construction was focused on both sides for 1.2 kilometers or starting from Jalan Nurul Amal in RW 05 to the bridge in RW 03.

"This construction was finally completed," she expressed, Monday (7/24).

Collapsed Sheet Pile on Jalan Hang Jebat 3 Repaired

She explained it had been started since August 2022 where the sheet pile has 800 meters long and 400 meters high.

"Hopefully, it is able to minimize inundation caused by overflowing waters of Apuran River," she said.

Kurniati (54), a resident of RW 03, Cengkareng Timur Urban Village positively welcomed and appreciated it.

"We're grateful, as the construction near my village has been completed," he stated.

Linked News
Popular News indeks
  1. Pramono Flags Off 10,000 Runners at Soekarno Run 2026

    access_time15-02-2026 remove_red_eye985 personFolmer
  2. Pramono Calls on Residents to Maintain Peace and Harmony During Ramadan

    access_time14-02-2026 remove_red_eye895 personFakhrizal Fakhri
  3. Jakarta Coastal Areas on Alert for Possible Tidal Flood

    access_time11-02-2026 remove_red_eye850 personAldi Geri Lumban Tobing
  4. Mark Your Calendars: Jakarta’s Lunar New Year 2026 Lineup is Here!

    access_time11-02-2026 remove_red_eye762 personAldi Geri Lumban Tobing
  5. 120 Joint Officers Ready to Guard Milkfish Festival 2026

    access_time13-02-2026 remove_red_eye600 personBudhi Firmansyah Surapati