You don't have javascript enabled. Good luck with that.
Pencarian
Pengerjaan Turap, Kali Apuran, Cengtim, Tuntas

Sheet Pile Construction in Cengkareng Timur Completed

The West Jakarta Water Resources (SDA) Sub-agency has completed the sheet piles construction on both sides of the Apuran River, in RW 03 and 05, Cengkareng Timur Urban Village, Cengkareng Sub-district.

Hopefully, it is able to minimize inundation caused by overflowing waters of Apuran River

West Jakarta SDA Sub-agency Head, Purwanti said the sheet pile construction was focused on both sides for 1.2 kilometers or starting from Jalan Nurul Amal in RW 05 to the bridge in RW 03.

"This construction was finally completed," she expressed, Monday (7/24).

Collapsed Sheet Pile on Jalan Hang Jebat 3 Repaired

She explained it had been started since August 2022 where the sheet pile has 800 meters long and 400 meters high.

"Hopefully, it is able to minimize inundation caused by overflowing waters of Apuran River," she said.

Kurniati (54), a resident of RW 03, Cengkareng Timur Urban Village positively welcomed and appreciated it.

"We're grateful, as the construction near my village has been completed," he stated.

Linked News
Popular News indeks
  1. Transjakarta Adjusts Operations Due to Public Demonstration

    access_time12-06-2026 remove_red_eye1987 personAldi Geri Lumban Tobing
  2. Pramono: Transjabodetabek Fare Adjustment Based on Careful Consideration

    access_time10-06-2026 remove_red_eye1049 personDessy Suciati
  3. BTN JAKIM 2026, Traffic Engineering and Alternative Routes Provided

    access_time11-06-2026 remove_red_eye905 personAldi Geri Lumban Tobing
  4. BTN JAKIM 2026: Pramono Invites Everyone to Have Fun While Running

    access_time13-06-2026 remove_red_eye799 personFakhrizal Fakhri
  5. Cipete Selatan Steps Up Waste Management at the Source

    access_time12-06-2026 remove_red_eye709 personTiyo Surya Sakti