You don't have javascript enabled. Good luck with that.
Pencarian
352 Kubik Lumpur Telah Diangkut Dari Pengerukan Kali Pesanggrahan

352 Cubic Meters of Mud Transported from Pesanggrahan River

The West Jakarta Water Resources (SDA) Sub-agency is dredging the 389-meter-long Pesanggrahan River mud that crosses Meruya Utara Urban Village in Kembangan Sub-district and Kebon Jeruk Urban Village in Kebon Jeruk Sub-district.

As the initial stage, we deployed two excavators and four trucks to transport the mud

West Jakarta SDA Sub-agency Head, Purwanti expressed the work which has been running for four days has succeeded in transporting as much as 352 cubic feet of mud.

"As the initial stage, we deployed two excavators and four trucks to transport the mud," she expressed, Tuesday (8/15).

Pesanggrahan River in Kebon Jeruk will Soon Be Dredged from Mud

According to her, the dredging was done from 3.5 to four meters deep. To speed up it, next week, her party would add two amphibious excavators and a truck to transport mud.

"It is carried out, thus the river capacity becomes more and the water flow can flow smoothly, thus it is expected to minimize inundation during the rainy season," she uttered.

It is targeted for the completion until six months ago.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1070 personFolmer
  2. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye454 personAldi Geri Lumban Tobing
  3. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye452 personBudhi Firmansyah Surapati
  4. Setu Babakan Presents Arts and Culture Extravaganza to Mark Jakarta Anniversary

    access_time20-06-2026 remove_red_eye422 personNurito
  5. Pramono Ensures Transparency in Labor-Intensive Program Recruitment

    access_time19-06-2026 remove_red_eye391 personDessy Suciati