You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaksel Perbaiki Turap Waduk Marinir Denjaka

Broken Sheet Pile in Cilandak Timur Being Repaired

We'll try to speed up it. Hopefully, it can be finished on target

The South Jakarta Water Resources (SDA) Sub-agency repairs the Marinir Denjaka Reservor's broken sheet pile, Cilandak Timur, Pasar Minggu.

South Jakarta SDA Sub-agency's Field Coordinator, Edi expressed the sheet pile repair was carried out up to 274 meters and three meters high.

Collapsed Sheet Pile in Cililitan Being Repaired

"The work progress has reached 50 percent," he expressed, Monday (10/16).

To smoothen it, around 11 personnel and heavy equipment type long-arm and amphibious excavators.

The work that has been started from July 2023 was targeted to be completed by the end of this year. Hopefully, it could run smoothly and could be beneficial to the surrounding environment.

"We'll try to speed up it. Hopefully, it can be finished on target," he stated.

Linked News
Popular News indeks
  1. Hosted in Sydney, Pramono Discusses Opening Australian Campuses in Jakarta

    access_time25-11-2026 remove_red_eye830 personDessy Suciati
  2. Pasar Baru Festival 2026 Brings Historic District to Life

    access_time27-11-2026 remove_red_eye611 personFolmer
  3. Pramono Explores Collaboration with UNSW Sydney to Prepare Jakarta Scholarships

    access_time28-11-2026 remove_red_eye540 personDessy Suciati
  4. Jakarta Tops Teqball at 2026 PON Beach Games

    access_time27-11-2026 remove_red_eye524 personAldi Geri Lumban Tobing
  5. Jakarta Design Connect 2026 Showcases 50 Works by Artists and Designers

    access_time27-11-2026 remove_red_eye508 personAnita Karyati