You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaksel Perbaiki Turap Waduk Marinir Denjaka

Broken Sheet Pile in Cilandak Timur Being Repaired

We'll try to speed up it. Hopefully, it can be finished on target

The South Jakarta Water Resources (SDA) Sub-agency repairs the Marinir Denjaka Reservor's broken sheet pile, Cilandak Timur, Pasar Minggu.

South Jakarta SDA Sub-agency's Field Coordinator, Edi expressed the sheet pile repair was carried out up to 274 meters and three meters high.

Collapsed Sheet Pile in Cililitan Being Repaired

"The work progress has reached 50 percent," he expressed, Monday (10/16).

To smoothen it, around 11 personnel and heavy equipment type long-arm and amphibious excavators.

The work that has been started from July 2023 was targeted to be completed by the end of this year. Hopefully, it could run smoothly and could be beneficial to the surrounding environment.

"We'll try to speed up it. Hopefully, it can be finished on target," he stated.

Linked News
Popular News indeks
  1. Fire at Pondok Bambu Allegedly Triggered by Electrical Short

    access_time19-05-2026 remove_red_eye1366 personNurito
  2. Governor Pramono Named Vice Chair of C40 Cities Steering Committee

    access_time18-05-2026 remove_red_eye992 personAldi Geri Lumban Tobing
  3. Inundation on DI Panjaitan Road Recede

    access_time20-05-2026 remove_red_eye829 personNurito
  4. Dharma Jaya Ready for Thousands of Eid al-Adha Sacrifices

    access_time20-05-2026 remove_red_eye633 personAldi Geri Lumban Tobing
  5. Rasuna Said Car-Free Day to Return in June 2026

    access_time16-05-2026 remove_red_eye605 personAldi Geri Lumban Tobing