You don't have javascript enabled. Good luck with that.
Pencarian
Warga Nikmati Keberadaan IPAL di Komplek Kebersihan Ciracas

No More Septic Tank, IPAL is Provided in Komplek Kebersihan Ciracas

The existence of waste water treatment (IPAL) at RW 09 of Komplek Kebersihan, Ciracas Urban Village, East Jakarta is replacing the septic tank.

It helps the environment cleanliness

RW 09 Ciracas Head, Triyanto, admitted there are 120 families from RT 16, 01, 12 flowing their waste water into the IPAL through the main pipe connected to their houses. It means no more resident's feces on the river.

Residential Scale SPALD-T Construction in Two Locations Completed

"The residents are very helpful with this. They do not need septic tank again," he said, Thursday (1/25).

According to him, this IPAL is able to handle 1,000 families. In fact, there are still 120 families with 17 RTs in total.

Meanwhile, East Jakarta Environment Sub-agency Head, Eko Gumelar, explained the IPAL was constructed by Jakarta Water Resources Agency in 2020 ago. The capacity is 150 cubic meter a day. This IPAL is processing feces and black water or liquid waste from residential areas.

"There are already 120 connections from local resident houses. It helps the environment cleanliness," he said.

According to him, this IPAL is also to prevent environmental pollution. Especially regarding ground water. Apart from that, it prevents residents from throwing feces into the river.

At this IPAL, liquid waste is processed in such a way that the resulting water is clear and clean. To prove this, the final result of the processing water is collected in a large pond and the fish are kept there. This is to prove that this water is not polluted by waste because the fish can live healthily.

"The processed water can also be used to watering the plants and extinguishing fire," he closed.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1707 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1478 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1334 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1119 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye815 personDessy Suciati