You don't have javascript enabled. Good luck with that.
Pencarian
Saluran di Jalan Angin Sejuk II Dinormalisasi

Channel on Jalan Angin Sejuk II Being Normalized

PPSU personnel from the Cilincing Sub-district Water Resources (SDA), North Jakarta are normalizing the water channel on Jalan Sejuk II, RT 10/11, Semper Barat Urban Village.

Hopefully, it will be completed quickly and will function optimally

Cilincing Sub-district SDA Executing Unit's Field Coordinator, Nandi Yantoro said channel normalization was carried out along 150 meters.

"It is done because the sheet pile is damaged and the width of the channel is small, this often leads to flooding," he expressed, Wednesday (5/15).

March, Channel Normalization on Jalan Kramat Kwitang Done

He explained the channel normalization was carried out by increasing the capacity of the channel to a height of 100 centimeters and a width of 60 centimeters.

"This is conducted to follow up on residents' aspirations through Musrenbang 2024," he explained.

He explained it has been ongoing since April 2024 by sending six personnel to the location.

"The work progress has touched 35 percent so far. If there are no obstacles, we are targeting the work to be completed by the end of June," he explained.

One of the residents from RW 11, Semper Barat Urban Village, Tama (54) admitted narrowing or small channels often trigger flooding when heavy rain occurs over a long period of time in the area.

"Hopefully, it will be completed quickly and will function optimally, thus there will be no more flooding," he hoped.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1707 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1478 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1334 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1118 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye814 personDessy Suciati