You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Air di Jalan Petojo Sabangan XI Dinormalisasi

Channel Normalization on Jalan Petojo Sabangan XI Completed

The water channel normalization located at Jalan Petojo Sabangan XI, RT 12/04, Petojo Selatan Urban Village, Gambir, Central Jakarta, finally completed. It was started at the end of April 2024.

Hopefully, it can minimize flooding

Gambir Sub-district Water Resources (SDA) Executing Unit Head, M Imawan said the normalization was conducted to minimize flooding due to overflowing water in the channel.

"The condition of some channels in residential areas has been covered. Therefore, the staff has re-formed the routes," he expressed.

Channel on Jalan Angin Sejuk II Being Normalized

His party also installed U-Ditch concrete measuring 40x60 centimeters along with a cover plate 35 meters long, as well as five control tank points measuring 60x60 centimeters.

"This work involves 11 personnel every day. We'll finish it today," he explained.

The work received appreciation from one of the residents from RW 04 Petojo Selatan Urban Village, Adi (33). He hoped, his residential area could be free of flooding after it was done.

"Hopefully, it can minimize flooding," he hoped.

Linked News
Popular News indeks
  1. Jakarta Claims Rp 2.27 T in Public Assets from Developer Obligations

    access_time06-08-2026 remove_red_eye745 personDessy Suciati
  2. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye572 personAldi Geri Lumban Tobing
  3. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye537 personFakhrizal Fakhri
  4. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye515 personDessy Suciati
  5. Jakarta Remains Indonesia's Top Investment Destination

    access_time07-08-2026 remove_red_eye510 personAldi Geri Lumban Tobing