You don't have javascript enabled. Good luck with that.
Pencarian
11 Sumur Resapan Sudah Dibangun di Ciracas

11 Infiltration Wells Built in Ciracas

Until now, 11 infiltration wells have been recorded as having been built in Ciracas Urban Village, East Jakarta. Until the end of December, 40 infiltration wells are targeted to be built.

We're optimistic all can be completed in December 2024

Ciracas Urban Village Head, Sudarna stated the well construction was focused on areas where flooding frequently occurs. To smoothen it, five personnel and one drilling mechine had been alerted in the location.

"We're optimistic all can be completed in December 2024," he expressed, Friday (9/6).

PPSU Builds Two Infiltration Wells at SDN Cijantung 06 Pagi

He detailed those 11 wells were located on Jalan Raya Pengantin Ali RT 08/06, RT 05/06, RT 09/06, RT 01/06, and on Jalan Penganten Ali 1, and RT 02/06 with two points.

Then Jalan Mahakam RT 10/06, Ciracas Prima RPTRA, at Gang Haji Gamin RT 08/01, Jalan Mustika Ratu RT 12/08, and Jalan Raya Centek RT 02/03.

"We urge the community and CSR to support the construction of these wells in an effort to anticipate flooding," he added.

Ciracas Urban Village Economy and Development Section Head, Rustri Manurung added the wells made were on average one meter in diameter and 18 meters deep. Each well could accommodate about 1.8 cubic meters of water.

"It has been ongoing since May," he stated.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1373 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye1034 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye960 personAldi Geri Lumban Tobing
  4. CNY 2577 Kongzili: Matakin Calls for Justice and Solidarity

    access_time22-02-2026 remove_red_eye835 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye734 personAldi Geri Lumban Tobing