You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Saluran Air di Jalan Wahid Rampung Akhir Desember
.
photo Andri Widiyanto - Beritajakarta.id

Late December, Channel Construction on Jalan Wahid Completed

The South Jakarta Water Resources (SDA) Sub-agency is building a new water channel on Jalan Wahid, Ciganjur Urban Village, Jagakarsa Sub-district. It is targeted for completion by the end of December.

Hopefully, the channel can effectively prevent flooding

Jagakarsa Sub-district SDA Executing Unit Head, Sartono said the channel was built to follow up on residents' aspirations through Regional Development Planning Forums (Musrenbang).

"This channel is built, as the area has yet to have a proper channel," he expressed, Wednesday (12/4).

Diversion Channel Construction to Muara Angke Reservoir Reaches 80 Percent

He explained it is 90 meters long and a U-ditch measuring 40x40 centimeters. "This work involves ten personnel," he explained.

It has been ongoing since November 28, 2024, and is now being accelerated using an excavator.

"Hopefully, the channel can effectively prevent flooding," he hoped.

The work received appreciation from one of the residents, Kurniawan (47). "Hope it can be done soon and function well, especially during the rainy season," he said.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1500 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye917 personAldi Geri Lumban Tobing
  3. Residents Flock to Cheap Bazaar at Cilandak Timur Urban Village Office

    access_time15-01-2025 remove_red_eye770 personTiyo Surya Sakti
  4. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye382 personFolmer
  5. 13 Inter-village Bridges in South Jakarta Revitalized

    access_time16-01-2025 remove_red_eye363 personTiyo Surya Sakti