You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Bersihkan Saluran Penghubung di Joglo

Connecting Channel on Jalan Eugenia IV Joglo Dredged from Mud

The connecting channel located on Jalan Eugenia IV, Joglo Urban Village, Kembangan Sub-district is being dredged from mud.

It aims to accommodate water in large quantities

West Jakarta Water Resources (SDA) Sub-agency Head, Purwanti stated mud in the channel was dredged up to 160 meters with three meters wide and four meters high.

"It aims to accommodate water in large quantities, especially in the rainy season," she expressed, Thursday (12/12).

Four Channels in Sawah Besar Normalized

She uttered it has been ongoing since December 8, 2024. "It is targeted for completion this week," she stressed.

The work received appreciation from a resident from RT 05/01, Joglo Urban Village, Deky Wahyudi (61).

"Hope it can minimize flooding when it rains," he hoped.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye482 personNurito
  2. Pramono Endorses Five-City Tour for Jazz Goes to Campus

    access_time12-09-2026 remove_red_eye460 personDessy Suciati
  3. No Damage Reported Following Magnitude 5.9 Seribu Islands Quake

    access_time12-09-2026 remove_red_eye459 personBudhi Firmansyah Surapati
  4. Jakarta Govt Fully Backs Kanye West's Ye Live in Jakarta 2026

    access_time16-09-2026 remove_red_eye454 personDessy Suciati
  5. Streetlights on Jalan Bekasi Timur and Pedati Pedestrian Bridge Back in Service

    access_time14-09-2026 remove_red_eye333 personNurito