You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Bersihkan Saluran Penghubung di Joglo

Connecting Channel on Jalan Eugenia IV Joglo Dredged from Mud

The connecting channel located on Jalan Eugenia IV, Joglo Urban Village, Kembangan Sub-district is being dredged from mud.

It aims to accommodate water in large quantities

West Jakarta Water Resources (SDA) Sub-agency Head, Purwanti stated mud in the channel was dredged up to 160 meters with three meters wide and four meters high.

"It aims to accommodate water in large quantities, especially in the rainy season," she expressed, Thursday (12/12).

Four Channels in Sawah Besar Normalized

She uttered it has been ongoing since December 8, 2024. "It is targeted for completion this week," she stressed.

The work received appreciation from a resident from RT 05/01, Joglo Urban Village, Deky Wahyudi (61).

"Hope it can minimize flooding when it rains," he hoped.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1296 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1126 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye838 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye290 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye286 personAldi Geri Lumban Tobing