You don't have javascript enabled. Good luck with that.
Pencarian
 Pembangunan Drainase di Pulau Tidung Rampung

New Water Channel Construction on Tidung Island Completed

Seribu Island Water Resource Sub-agency completed the new water channel construction on residential at RT 01/04, Tidung Island Urban Village, Seribu Selatan Island Sub-district.

The construction was started on January 15

Seribu Island Water Resource Sub-agency Head, Mustajab, said the channel construction was part of local resident's request since the area was often inundated.

Channel Normalization on Jalan Pluit Permai Raya to Complete February

"The construction was started on January 15 and completed in end of January," he said, Monday (2/3).

He added that the channel is built along 60 meter and completed with four absorption wells.

"The well size is 40x40x50 cm. It is connected to each other by using six inch pipe," he added.

According to him, nine Blue taskforce personnel were deployed during the construction.

"Hopefully the local residents also maintain this newly built water channel. Please contact us if there is still inundation or problem with the channel," he continued.

Meanwhile, one of residents living at RW 04, Tidung Island Urban Village, Jamal (42), admitted happy with the channel realization.

"I hope there will be no more inundation around the area," he stated.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1455 personFolmer
  2. Public Urged to Use Public Transit for GBK Events to Avoid Heavy Traffic

    access_time05-06-2026 remove_red_eye1214 personAldi Geri Lumban Tobing
  3. Central Jakarta Government Responds Quickly to Fire Victims in Tanah Tinggi

    access_time04-06-2026 remove_red_eye985 personFolmer
  4. Traffic Measures Prepared to Ease Congestion Around GBK This Weekend

    access_time04-06-2026 remove_red_eye975 personAldi Geri Lumban Tobing
  5. Jakarta Waives Motor Vehicle Tax Fines and Title Transfer Fees

    access_time01-06-2026 remove_red_eye886 personAldi Geri Lumban Tobing