You don't have javascript enabled. Good luck with that.
Pencarian
Pilar kolong Tol Becakayu dipercantik mural

Mural Painting Adorns Becakayu Roll Underpass

Four PPSU personnel are seen making mural paintings on several support pillars of the Bekasi - Cawang - Kampung Melayu (Becakayu) Toll Underpass on Jalan Laksamana Malahayati, Duren Sawit Urban Village, Duren Sawit Sub-district, East Jakarta.

To eliminate the impression of clutter

"This mural painting is made to eliminate the impression of clutter along the toll road support," said Duren Sawit Urban Village Head, Nur Rifiandini, Tuesday (11/11).

She explained, the work has been ongoing for three weeks. In total, there are 56 pillars and 10 others have already been decorated with murals. It is targeted to be completed by next December.

Papanggo PPSU Personnel Beautify Gang Kapuk with Mural

She hoped that the private sector could contribute through a corporate social responsibility (CSR) program to support finance the creation of the mural.

"The murals adorning the pillars predominantly feature abstract motifs. Additionally, there are images of Ondel-ondel, Betawi traditional houses, and other cultural elements," she closed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye868 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye354 personAldi Geri Lumban Tobing
close