You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Kali Swasembada Capai 70 Persen

Swasembada Retaining Wall Being Repaired for the Common Good

The repair work on the Swasembada River's retaining wall on Jalan Swasembada Barat XXIV to XXII, RW 04, Kebon Bawang Urban Village, Tanjung Priok Sub-district, North Jakarta, is currently 70 percent complete.

This is done manually involving 13 personnel

Tanjung Priok Sub-district Water Resources (SDA) Executing Unit Head, Neti Heriati said, the repair of the retaining wall with 1.2 high meters is being conducted along 90 meters. It has been ongoing since October 24 and is targeted to be completed by early December 2025.

"This is a follow-up to the members' recess proposal of the Jakarta City Council," she expressed, Tuesday (11/25).

5,355 Malfunctioned Street Lights in North Jakarta Repaired

According to her, the repair was conducted, as the retaining wall often eroded due to high water flow and aging.

"This is done manually involving 13 personnel. The construction of this retaining wall uses materials such as river stones and dolken wood, then the top of the retaining wall is plastered," she explained.

By doing so, residents will feel safer and more comfortable. Moreover, the river will be more optimal in minimizing the potential for flooding or inundation.

"Hopefully, it can be done on time. We also urge locals to maintain this river," she added.

The repair itself received appreciation from one of residents from RT 03/04, Kebon Bawang Urban Village, Ade Samer (52).

"Thank you, and I hope that with this improvement, there will no longer be floods," he stated.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1402 personFakhrizal Fakhri
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye1003 personAldi Geri Lumban Tobing
  3. CNY 2577 Kongzili: Matakin Calls for Justice and Solidarity

    access_time22-02-2026 remove_red_eye871 personAldi Geri Lumban Tobing
  4. Jalan RS Fatmawati Widening Supports Transit-Oriented Development

    access_time19-02-2026 remove_red_eye762 personTiyo Surya Sakti
  5. One-Year Reflection: Pram-Rano Outline Performance Achievements

    access_time21-02-2026 remove_red_eye653 personDessy Suciati