You don't have javascript enabled. Good luck with that.
Pencarian
Desember, 3.725 Lampu LED Akan Terangi Jakbar

W. Jakarta Installed 3,725 LED Lights

Thousands of street lights points (PJU) in West Jakarta will be replaced with light emitting diode (LED) lamp. It is targeted to be finished at the end of 2015.

Our target is finished before December

Joko Laksono, Head Section of Supervision and Control for West Jakarta Industry and Energy Sub Department said that there are 3,725 street lights will be replaced with LEDs.

739 LED Lights will Be Installed in KBT Inspection Road

"Our target is finished before December. The reason is due to the increasing need for lighting. It is recorded as much as 3,725 LED lights by 40 watt of power is still progressing," he expressed, Monday (11/9).

Laksono added that the installation must be accelerated since more residents request it through Qlue.

"Because this is their aspirations. We also target lights installation in slum area,” he finished.

Linked News
Popular News indeks
  1. The Lights-Out Action Successfully Reduces Carbon Emissions

    access_time27-04-2026 remove_red_eye553 personAldi Geri Lumban Tobing
  2. MRT Jakarta Urged to Enhance Power Outage Mitigation System

    access_time27-04-2026 remove_red_eye542 personFakhrizal Fakhri
  3. May Day: Transjakarta Service Adjustments

    access_time01-05-2026 remove_red_eye525 personAldi Geri Lumban Tobing
  4. Dharma Jaya Sets Strategy to Bolster Jakarta Food Security

    access_time27-04-2026 remove_red_eye450 personAldi Geri Lumban Tobing
  5. Rano Pays Condolence Visit to Bekasi Train Crash Victim in Kemayoran

    access_time29-04-2026 remove_red_eye446 personBudhi Firmansyah Surapati