You don't have javascript enabled. Good luck with that.
Pencarian
Sodetan Jl Enggano Dikeruk
.
photo Rio Sandiputra - Beritajakarta.id

Waterway at Jalan Enggano Dredged

Waterway at Jalan Enggano, precisely in front of post 8 Tanjung Priok Port, North Jakarta, is dredged. Due to much sediment makes the water flow to Lagoa Tirem River hampered.

The waterway had never been dredged for 10 years. Consequently, the mud and trash slowly  make it clogged

Tanjung Priok Sub-District Head, Yusuf Majid stated that, the dredged waterway has 18 meters width . So that if it is done being dredged, it could reserve more water.

"The waterway had never been dredged for 10 years. Consequently, the mud and trash slowly  make it clogged. Thus cause puddle in the area during rainy season," he said, Monday (12/7).

Connecting Channel in Meruya Utara Dredged

To clean the mud the officers are assisted by Water Management and Bina Marga Sections of Tanjung Priok Sub-District. The special equipment for siphoning mud and water was also sent to accelerate the process.

"In the past when rainy season, due to clogged the area was often inundated until 2-3 days. But, by dredging the mud the puddle could be minimized or nothing at all," he closed.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye414 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye396 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye352 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye324 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye316 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik