You don't have javascript enabled. Good luck with that.
Pencarian
Sodetan Jl Enggano Dikeruk

Waterway at Jalan Enggano Dredged

Waterway at Jalan Enggano, precisely in front of post 8 Tanjung Priok Port, North Jakarta, is dredged. Due to much sediment makes the water flow to Lagoa Tirem River hampered.

The waterway had never been dredged for 10 years. Consequently, the mud and trash slowly  make it clogged

Tanjung Priok Sub-District Head, Yusuf Majid stated that, the dredged waterway has 18 meters width . So that if it is done being dredged, it could reserve more water.

"The waterway had never been dredged for 10 years. Consequently, the mud and trash slowly  make it clogged. Thus cause puddle in the area during rainy season," he said, Monday (12/7).

Connecting Channel in Meruya Utara Dredged

To clean the mud the officers are assisted by Water Management and Bina Marga Sections of Tanjung Priok Sub-District. The special equipment for siphoning mud and water was also sent to accelerate the process.

"In the past when rainy season, due to clogged the area was often inundated until 2-3 days. But, by dredging the mud the puddle could be minimized or nothing at all," he closed.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1615 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1455 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1320 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1089 personDessy Suciati
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye980 personDessy Suciati